Orot Rabin is a power station on the Mediterranean coast in northwestern Hadera, Israel. Its seawater-cooling system supplies warm water to a restored stretch of the Hadera Stream, where sharks gather near the shore in winter. The station’s six coal-fired generating units had a combined capacity of about 2,500 megawatts, and two replacement natural-gas combined-cycle units entered commercial operation in January 2025 and January 2026. Its transition away from coal has involved repeated timetable changes and debate over pollution, public health, and the retention of older units for emergency electricity supply.

02Overview and Location

Orot Rabin has been identified as Israel’s largest power plant; its host city, Hadera, lies on the Mediterranean coastal plain about 45 kilometers north of Tel Aviv.[6] The station combines electricity generation with coastal infrastructure, including seawater cooling and a dedicated nearby pier for unloading coal from cargo ships.[1] A reverse-osmosis desalination facility also operates on its premises.[7]

The station’s coal-generating capacity was reported at about 2,500 megawatts, nearly 20 percent of Israel Electric Corporation’s total capacity at the time of an account describing its planned conversion to natural gas.[8] Its six coal-fired units comprised four older units dating from the early 1980s and two newer units equipped with scrubbers intended to reduce emissions.[3] By May 2026, the site was described as containing six coal-fired units and two gas-fired units, with separate emissions permits for the gas units.[9]

Orot Rabin’s electricity-production operating system has also been used as an example of critical infrastructure potentially vulnerable to severe cyberattack.[10] The example concerned the possibility of disruption, rather than a reported cyberattack on the station.[10]

03History

The station was formerly known as Maor David, and the establishment of Nahal Hadera Park accompanied its construction.[2] Accounts place its commissioning in 1981 and the beginning of operations in 1982.[8][11] Units 1–4 entered operation in the early 1980s, while the two newer coal units began generating in 1996.[3][8] The newer units had scrubbers to limit gaseous emissions; the older four were described as the station’s oldest, least efficient, and most polluting coal generators.[3][8]

In December 2015, the Environmental Protection Ministry directed Israel Electric Corporation to reduce coal consumption at Orot Rabin by 8–10 percent during 2016.[12] This was a condition for permission to delay a broader scrubber-installation project estimated to cost NIS 8 billion.[12] A 2016 decision called for the station’s closure, followed by an August 2018 government resolution providing for replacement of the four older coal units by June 2022.[13][3] The replacement plan envisaged two combined-cycle natural-gas generators with approximately 1,200 megawatts of combined output.[14]

The National Planning and Building Council approved plans for the two new gas units in 2020.[14] Under that plan, ordinary operation of the four older coal units was to end, but they would remain available as a strategic reserve for emergencies.[14] Approval coverage anticipated the first new unit starting by the end of 2022 and the second during the first half of 2023.[14] A later account specified their scheduled commercial-operation dates as June 2022 for unit 70 and March 2023 for unit 80.[4]

Unit 70 actually began commercial operation in January 2025.[4][15] Its introduction contributed to a significant decline in coal-fired generation: units 1–4 produced 0.4 terawatt-hours from coal in the first half of 2025, less than one-quarter of their output during all of 2024.[15] Half of that first-half 2025 generation occurred during Operation Rising Lion.[15] The electricity-sector report designated units 1–4 for preservation and linked their routine shutdown, and conversion of the remaining coal units, to implementation of government and ministerial decisions and timetables.[15]

In January 2026, Hadera Municipality approved a move allowing operation of the planned units 70–80 on natural gas.[16] Unit 80 received Electricity Authority approval for an operating license covering combined-cycle generation using natural gas, with diesel backup, at approximately 650 megawatts.[16][17] The license was to take effect after provision of a required bond and ministerial approval, and to remain valid until 2049.[16] A September 2026 account recorded unit 80’s actual commercial-operation date as January 2026.[4]

The January municipal approval conditions included reducing the coal stockpile and monitoring coal dust at four perimeter stations.[16] An approximately 80 percent reduction in coal-dust pollution was anticipated, while units 5–6 were expected to undergo conversion to natural gas over about two years.[16][17]

On January 5, 2025, the Houthis claimed to have attacked Orot Rabin with a Palestine-2 ballistic missile.[18] The reported Israeli military account stated that a missile launched from Yemen had been intercepted before entering Israeli territory; the account did not report a strike on the station.[18]

04Economy and Infrastructure

The Hadera desalination facility, situated on the power station’s premises, has operated since May 2010 and uses reverse osmosis.[7] It has been described as the largest desalination plant of its kind in the world, supplying approximately 127 million cubic meters of high-quality water annually.[7] Hadera also has a direct off-loading facility for freighters supplying coal to a nearby power station, alongside Orot Rabin’s specifically documented coal-unloading pier.[19][1]

Seawater is used to cool the generating units.[1] A 2010 account put the station’s seawater discharge at about 160,000 cubic meters per hour and described the water warming during turbine cooling before returning to the sea.[11] In the stream-restoration arrangement, seawater passes through the station and is pumped into the Hadera Stream, helping maintain flow throughout the year.[2]

Emissions-control systems were installed on two of the six coal units, while the other four continued operating without those systems.[20] A study reported in 2025 used data from eight air-monitoring stations to examine pollution before and after filtration installation.[20] It found reductions in nitrogen oxides of 41 percent in summer and 24 percent in winter, alongside sulfur dioxide reductions of approximately 51 percent in summer and 19 percent in winter.[20]

Electricity-supply security has been cited as a reason to retain coal units as backup.[14] In October 2025, the Energy Minister extended operation of units 1–4 through 2028, allowing up to 500 operating hours annually for exceptional and emergency situations.[9] The extension was connected to temporary wartime shutdowns of gas fields.[9] In August 2026, Israel Electric Corporation described the units’ intended status as hot preservation through the end of 2028, with operation only in a risk or emergency situation.[5]

05Notable Sites

Nahal Hadera Park includes a restored 1.5-kilometer stretch of the stream associated with the power station’s cooling-water system.[2] Improving the appearance of the lower stream, which had become an ecological nuisance, was a condition of the station’s operation.[11] Landscaping between the station and stream included an area constructed using coal ash.[11]

During winter, sharks gather in the warm water flowing from the station and can approach within several meters of the shore.[2] An information station and observation post provide viewing opportunities on winter weekends and holidays.[2] The station itself has four distinctive large chimneys; its six coal-fired generating units have been described as arranged with two units per chimney.[13]

06Controversies

Repeated delays in gas-unit commissioning and extensions of coal-unit preservation generated disputes over emergency electricity supply and pollution control.[4][5] A 2019 postponement moved the older units’ closure timetable to December 2025, while subsequent accounts described preservation or emergency operation through 2028.[13][5] The gas-unit delays were attributed partly to COVID-19 and war; the Electricity Authority also identified supplier-management and scheduling issues, an account disputed by the utility.[4]

Health-impact estimates have varied: a 2015 ministry estimate attributed 25 preventable premature deaths annually to changes at Orot Rabin, while energy-market sources questioned whether the local estimate had Health Ministry validation.[12] A May 2026 account summarized academic estimates linking station coal pollution to 50–250 premature deaths annually in the region; these were estimates of an association, not an agreed official count.[9] A legal petition challenged revised emissions conditions, alleging allowance of sulfur dioxide at 1,400 micrograms per cubic meter against 150 under the European directive it cited, as well as lower-quality coal and relaxed requirements.[9]

Coal dust has also prompted local complaints, including accounts of blackened laundry, houses, and cars in Hefsiba; Hadera ranked first in the Environmental Protection Ministry’s pollution survey the preceding year.[13] A 2026 report described emissions above permitted levels during 40 percent of tested coal-unit operating time, including equipment faults, but no subsequent ambient-standard exceedances at regional monitors.[5] The regional environmental association sought stricter checks and maintenance, while the utility maintained that startup emissions during readiness tests did not breach its permit.[5] Another 2026 account identified the station as Israel’s most polluting facility, while reporting a 49 percent fall in its total pollution cost as coal use declined.[21]

Sources

  1. 1Globes, The High Court issued a conditional order against the strike at the Israel Electric Corporation, accessed on November 5, 2026.
  2. 2The Jewish Agency for Israel, Hadera: A different sort of tourism | The Jewish Agency – U.S., accessed on November 5, 2026.
  3. 3Ynet, Approved: Instead of coal, 2 natural gas units will be built in Hadera, accessed on November 5, 2026.
  4. 4Calcalist, Electricity Authority to Israel Electric Corporation: We will not recognize about NIS 230 million of the costs of the delay at Orot Rabin, accessed on November 5, 2026.
  5. 5Maariv, "Data that cannot be ignored": The new findings from Orot Rabin, accessed on November 5, 2026.
  6. 6JewishGen, KehilaLink: Hadera, Israel, accessed on November 5, 2026.
  7. 7Jewish Virtual Library, Water in Israel: Water Desalination, accessed on November 5, 2026.
  8. 8The Jerusalem Post, Heavily-polluting Hadera power plant to be converted to natural gas, accessed on November 5, 2026.
  9. 9The Times of Israel, accessed on November 5, 2026.
  10. 10Institute for National Security Studies, Israeli Expert: ‘Cyberspace Has Become a Battlefield, accessed on November 5, 2026.
  11. 11Ynet, Mixing electricity and water: Hiking routes in Hadera Stream, accessed on November 5, 2026.
  12. 12Globes, Israel Electric Corp ordered to reduce reliance on coal, accessed on November 5, 2026.
  13. 13The Times of Israel, accessed on November 5, 2026.
  14. 14Calcalist, Construction of two power stations in Hadera approved—to operate using gas, accessed on November 5, 2026.
  15. 15Israel Electricity Authority, Report on the State of the Electricity Sector 2024–25, accessed on November 5, 2026.
  16. 16The Jerusalem Post, Orot Rabin power plant to reduce dependency on coal, accessed on November 5, 2026.
  17. 17Maariv, After years of soot and dust: Israel’s pollution capital undergoes a dramatic change, accessed on November 5, 2026.
  18. 18Meir Amit Intelligence and Terrorism Information Center, Terrorist Events, January 2025, accessed on November 5, 2026.
  19. 19Jewish Virtual Library, Israel Society & Culture: Infrastructure, accessed on November 5, 2026.
  20. 20Ynet, Is Hadera breathing a sigh of relief?, accessed on November 5, 2026.
  21. 21Calcalist, Precisely under the cover of war: Fewer pollutants were emitted, accessed on November 5, 2026.

IsraelPedia Question & Answers

  • What is Orot Rabin?

    Orot Rabin is a power station on the Mediterranean coast in northwestern Hadera, Israel. Its six coal-fired units had a combined capacity of about 2,500 megawatts, and two natural-gas combined-cycle units entered commercial operation in January 2025 and January 2026.

  • How does Orot Rabin supply warm water to Hadera Stream?

    Orot Rabin uses seawater to cool its generating units, then pumps the warmed water into Hadera Stream. This arrangement helps maintain the stream’s flow throughout the year and is associated with a restored 1.5-kilometer stretch in Nahal Hadera Park.

  • When did Orot Rabin begin operating?

    Accounts place Orot Rabin’s commissioning in 1981 and the beginning of its operations in 1982. Its first four coal units entered operation in the early 1980s, and its two newer coal units began generating in 1996.

  • What replaced Orot Rabin’s older coal-fired units?

    Two combined-cycle natural-gas generators, planned with approximately 1,200 megawatts of combined output, were intended to replace Orot Rabin’s four older coal units. Unit 70 began commercial operation in January 2025, and unit 80 began in January 2026. The older units were designated for preservation and emergency use rather than ordinary operation.

  • Why were Orot Rabin’s coal units kept available after the gas units began operating?

    Orot Rabin’s coal units were retained as backup for electricity-supply security. In October 2025, the Energy Minister extended operation of units 1–4 through 2028, allowing up to 500 operating hours annually for exceptional and emergency situations. The extension was connected to temporary wartime shutdowns of gas fields.

  • What pollution-control findings have been reported at Orot Rabin?

    A 2025 study using data from eight air-monitoring stations found that filtration installation was associated with nitrogen oxide reductions of 41 percent in summer and 24 percent in winter. The study also reported sulfur dioxide reductions of approximately 51 percent in summer and 19 percent in winter.

  • Can visitors see sharks near Orot Rabin?

    Sharks gather in winter in the warm water flowing from Orot Rabin and can approach within several meters of the shore. An information station and observation post offer viewing opportunities on winter weekends and holidays.