Nuclear Power in Israel

Published

01In brief

Nuclear power in Israel is a proposed source of civilian electricity generation, distinct from the country’s established nuclear research activities. Israel had no commercial nuclear reactors generating electricity as of May 2026, although nuclear power stations had been discussed for decades and land near Shivta in the Negev had been reserved for a possible plant. Natural gas supplies about 72% of electricity production, making proposals for nuclear generation part of a wider discussion about diversifying the energy system. Government planning has examined nuclear power within conditional scenarios for 2050, while separate initiatives address nuclear-fusion research rather than construction of conventional nuclear power stations.

02Overview

Israel’s nuclear-electricity proposals concern a possible addition to an electricity system dominated by natural gas, not the conversion of an existing commercial nuclear fleet.[1][3] The country’s nuclear research centers at Soreq and near Dimona are distinct from electricity-generating power stations, both in their functions and in the scale of their reactors.[6] Professional discussion has included a first commercial station in the Negev and possible small modular reactors serving industrial and high-technology demand.[1]

The Ministry of Energy and Infrastructure’s roadmap to 2050 treats nuclear power as an option under early evaluation.[4] It calls for preliminary inter-ministerial feasibility studies and identifies technological, regulatory, and policy questions that would have to be addressed before a power reactor could be established.[4] Its nuclear scenarios are planning exercises rather than decisions to construct plants.[4]

The electricity system provides an important context for these proposals: in 2022, natural gas supplied nearly 70% of generation, coal about 20%, and renewables about 10%, primarily from solar energy.[4] A 2026 account placed natural gas at approximately 72% and described a preceding decade in which gas generation increased while coal and diesel declined.[3] Government Resolution 465, adopted in October 2020, set a target of 30% renewable electricity by 2030, with solar expected to supply most renewable generation.[3]

03Origins and Early Research

Prime Minister David Ben-Gurion established the Israel Atomic Energy Commission on June 13, 1952.[7] The commission advises the government on nuclear policy and research priorities, implements government policy, and represents Israel in international nuclear organizations; its director general reports directly to the prime minister.[7] Its activities began at a research institute near Rehovot, before the development of the Soreq and Negev research centers.[7]

In 1957, an Israeli committee considered two large reactors for industrial electricity production but rejected them because of their expense.[8] It selected a research reactor instead, intending to give scientific and technical personnel experience with problems associated with power reactors and to prepare for possible future nuclear generation.[8] Natural uranium was chosen partly because Israel hoped to produce as much of its fuel as possible from domestic potash resources; ground was broken for the plant in 1959.[8]

The Soreq Nuclear Research Center was founded in 1958, and its research reactor began operating in 1960.[7] The Nuclear Research Center Negev was established at the end of 1959, with the site chosen as part of a policy to develop the region.[7] The Dimona complex developed through Israeli-French cooperation, with Norway supplying heavy water, and included research-reactor and nuclear-waste-disposal activities rather than a commercial generating station.[9]

A January 1961 diplomatic summary recorded Israeli expectations that a power reactor might follow in perhaps ten years, or possibly fifteen years or more.[10] It presented Dimona as a research tool intended to provide experience, rather than as a reactor intended to generate electricity.[10] The planned complex extended beyond the reactor itself to hot and cold laboratories, waste-disposal facilities, a facility for rods, offices, library services, and a medical unit.[10]

04Power and Desalination Proposals

In July 1964, U.S. President Lyndon Johnson announced that a three-person team from the Department of the Interior and the Atomic Energy Commission would begin discussions with Israeli representatives in Tel Aviv about desalination.[11] Following Johnson’s June meeting with Prime Minister Levi Eshkol, the team was to investigate the technical and economic feasibility of a combined nuclear-power and seawater-desalination plant in Israel.[11] The announcement concerned a feasibility investigation, not authorization to construct a plant.[11]

The initiative reflected expectations that nuclear installations might supply both electricity and fresh water.[11] A U.S. study cited in the announcement suggested that large combined plants could produce these outputs at competitive costs by about 1975 in some water-short coastal areas.[11] By February 1965, anticipated acquisition of a power-and-desalination plant had increased Israeli interest in importing slightly enriched-uranium reactors and reduced interest in developing natural-uranium reactors domestically, although the direction of atomic-energy development remained uncertain.[12]

A proposal circulated in 1967 envisioned three large nuclear plants: two on Israel’s Mediterranean coast and a third near the northern Gulf of Aqaba, in either Jordan or Israel.[13] It envisaged raising an initial $200 million and assigning the International Atomic Energy Agency responsibility for plant operations and nuclear-material accounting.[13] The first plant was to produce the equivalent of approximately 450 million gallons of fresh water daily.[13] These provisions remained a proposal rather than evidence of a completed installation.[13]

Nuclear electricity was considered again in the 1970s, but the proposed Negev station did not advance into an operating plant.[14] Retrospective reporting describes international pressure as a reason for the proposal’s rejection.[14] A separate account linked cancellation of a prospective U.S.-Westinghouse arrangement to India’s 1974 nuclear test and the subsequent creation of the Nuclear Suppliers Group.[15] Later reporting also described earlier plans being shelved after nuclear accidents elsewhere.[16]

05Renewed Planning Since 2007

In 2007, Infrastructure Minister Benjamin Ben-Eliezer said he intended to bring the possibility of a nuclear station before the cabinet amid concern about electricity supplies.[14] The proposed station had a capacity of 1,200 megawatts, estimated at 8–10% of future electricity needs.[14] Contemporary estimates put construction time at at least eight years, meaning the project would not resolve the immediate shortage.[14]

In 2009, Israeli officials sought U.S. assistance for a civilian nuclear plant in the southern Negev, with no response from Washington yet reported.[16] The proposal envisaged international monitoring of the civilian reactor without extending monitoring to Israel’s other nuclear capabilities.[16] A government report prepared for the Infrastructure Ministry had judged a nuclear plant suitable for Israel’s needs, and land in the south had already been reserved for such a purpose.[16]

Israel announced plans in March 2010 for a third, civilian reactor to produce electricity and expressed willingness to subject it to nuclear safeguards.[17] That year, the Israel Electric Corporation and the Israel Atomic Energy Commission signed an agreement to develop engineering and technical infrastructure for a possible future plant.[18] No plant was then in the works: the agreement aimed to preserve accumulated knowledge and pass it to a new generation, including through a proposed undergraduate program for electrical engineers specializing in nuclear power.[18] The limited number of engineers with atomic backgrounds was an identified concern.[18]

In 2011, the Ministry of National Infrastructures commissioned an external feasibility study while reconsidering a Shivta station.[19] The proposed Israel Electric Corporation project would produce 1,200 megawatts, roughly 10% of the corporation’s then-current generating capacity.[19] The study also examined designating an area as “ex-territorial,” but did not establish that the plant had been approved.[19] In 2012, Israel remained classified among countries without nuclear power plants that had nevertheless proposed power reactors.[20]

By 2017, the Shivta site was statutorily reserved, the electricity corporation retained relevant professional expertise, and many government experts supported construction.[2] In 2019, the Energy Ministry approached the Finance Ministry about hiring an international radiation-protection expert; earlier plans had envisaged a 1,300-megawatt station in the southern Negev.[21] Following electricity-market reform ending the corporation’s generation monopoly, a future project was expected to be built by a private entity instead.[21] The ministry intended to submit recommendations within eighteen months, with supply diversification and reduced dependence on gas-fired stations presented as potential benefits.[21]

06Recent Policy and Site Planning

In May 2025, the Energy Ministry said it was preparing work on nuclear electricity generation for presentation to the government in the second half of the year.[22] The work apparently included regulations, and Energy Minister Eli Cohen said he wanted to present a professional study enabling the government to decide whether to establish a nuclear-energy facility.[22] An inter-ministerial committee also recommended a comprehensive examination of energy security, including nuclear power and other low-emissions sources.[22]

A May 2025 site proposal identified an area near Shivta in the Negev for review by a regional planning and building committee.[23] The review ruled out Besor because of proximity to a military airfield and relevant international airport guidance, Nitzanim because of contamination concerns in the event of a military strike and doubts about economic feasibility, and Beit Guvrin because of dense population and its use as an Israel Defense Forces training zone.[23]

A separate 2025 planning development concerned Rogem, approximately twelve kilometers north of the previous proposed location near Shivta.[24] The Southern District Planning Committee unanimously recommended advancing the Rogem location to the National Planning and Building Council after concerns arose about suspected geological faults at the earlier site.[24] This was a recommendation about a possible location, not a government decision to build a station.[24] The Energy Ministry’s stated rationale was to prepare for potential energy-supply gaps after natural-gas reserves decline.[24]

In December 2025, Cohen said Israel was seriously examining a nuclear power plant and had established an expert team to formulate principles for a national nuclear-energy strategy.[25] He intended to bring its recommendations to the cabinet, but the announcement supplied neither a cabinet construction decision nor a construction schedule.[25] By May 2026, professional discussion of a Negev station and small modular reactors had grown, while Israel still had no commercial nuclear reactors generating electricity.[1]

07Practice and Research Applications

Soreq’s five-megawatt reactor began operating in 1960 under the U.S. Atoms for Peace program.[26] A light-water, pool-type reactor, it was used for training and research in reactor physics, radiography, neutron diffraction, activation analysis, and gemstone color treatment.[26] Its intended contribution was to develop applications of nuclear technology in electricity, industry, medicine, and agriculture, not to supply commercial electricity.[26] Civilian research at the center also included space science.[27]

Israel undertook to use the Soreq reactor for civilian purposes under its supply agreement.[26] Oversight initially involved the United States and later passed to the International Atomic Energy Agency, while reactor safety remained the responsibility of the Israel Atomic Energy Commission.[26] The reactor is a safeguarded civilian research facility, distinct from the larger Negev center near Dimona.[28] Stated oversight arrangements for Soreq include a safety unit and a committee reporting to the prime minister.[29]

Plans to replace reactor functions with accelerator-based research have appeared over several periods.[27][28] A 2008 report described a newly purchased German particle accelerator expected to replace the reactor’s research role and permit eventual shutdown.[27] Israeli officials subsequently planned to phase out the reactor by 2018 because of its age and the dwindling supply of U.S.-provided highly enriched uranium fuel, with an accelerator intended to assume many research and medical functions.[28] These were plans and forecasts, not confirmation that shutdown occurred on that timetable.[27][28]

In 2014, Israel completed a project returning spent highly enriched uranium fuel from Soreq to the United States.[30] The Soreq Applied Research Accelerator Facility was intended to take over major reactor tasks as part of efforts to phase out highly enriched uranium fuel.[30]

Research-reactor safety involves issues different from those of commercial generating stations.[6] The quantity of fissile material at Dimona was described as about two orders of magnitude smaller than in a 1,000-megawatt electricity-generating reactor.[6] The reactor is housed in a containment building and undergoes maintenance and upgrades, including component replacement and checks of the steel tank holding fuel rods and the neutron absorber during maintenance cycles.[6] Published planning also envisaged eventual shutdown and replacement by a new system.[6] Spent fuel requires safe storage and continuous cooling because it continues to emit radiation and decay heat.[6]

08Fusion Research

The Ministry of Energy issued a call for a fusion-research consortium led by the Hebrew University, Tel Aviv University, and the Soreq Nuclear Center.[5] A proposed next step was a national nuclear-fusion research institute with investment of approximately NIS 30 million.[5] This initiative concerned fusion research rather than construction of a conventional nuclear-fission power station.[5]

A larger proposal reported in 2026 responded partly to rising electricity demand and data-center expansion.[31] The Energy Ministry recommended a middle investment option of NIS 500 million to NIS 1 billion over five to seven years, involving consortia of public institutions, private companies, and research organizations, with possible participation by Rafael and Elbit.[31] Soreq’s particle accelerator and other research infrastructure could support the work.[31] The proposal was not an approved government program and had no funding allocation, while commercially viable fusion remained a distant and uncertain prospect.[31]

09Significance for Energy Planning

The ministry’s 2050 roadmap estimates that land constraints and required safety distances from population centers would limit nuclear capacity to approximately 15–20% of demand.[4] Nuclear generation would therefore need to operate alongside sources such as solar energy, hydrogen, or natural gas with carbon capture, rather than replace the entire energy system.[4] The roadmap also identifies a balancing problem between intermittent solar generation and nuclear power’s constant output, requiring energy storage.[4]

Its conditional “red” pathway assumes several nuclear plants operating by 2050, either two large plants or several smaller ones.[4] Nuclear power and red hydrogen together supply approximately 20% of the energy mix in that scenario, while the electricity-generation table assigns nuclear about 19% of generation.[4] The pathway depends on technological development, resolution of policy issues, techno-economic analysis, and public discussion.[4] It forms part of integrated decarbonization planning premised on the conclusion that no single technology can achieve carbon neutrality alone.[4]

Diversification has a longer history in Israeli energy policy: dependence on imported fuel contributed to the selection of coal as a strategic electricity source, while the later introduction of natural gas reduced fuel-import dependence and enabled private electricity producers.[32] One policy recommendation proposed approximately four gigawatts of nuclear capacity as a future energy source, without establishing government approval or a construction commitment.[32]

A separate business-as-usual scenario projected that natural gas would meet 70% of electricity-production and large-industry energy needs within a decade, with renewable electricity reaching 10%.[32] That scenario also emphasized Israel’s continued position as an “electricity island,” with insufficient grid redundancy making backup diesel and fuel oil necessary.[32] Nuclear proposals have consequently been discussed alongside questions of diversification, reserve supplies, and long-term energy security rather than solely as individual construction projects.[21][24]

10Controversies and Public Opposition

Israel’s non-signature of the Nuclear Non-Proliferation Treaty creates diplomatic and practical questions about civilian nuclear cooperation.[22] Reporting has identified possible difficulty obtaining approvals and reluctance among international companies, rather than establishing that a civilian station is legally impossible.[22] Earlier coverage described treaty membership and international inspections as requirements, while later discussion emphasized obstacles involving fuel, expertise, industrial capacity, cost, workforce, security, and public acceptance.[18][15] A SAPIR Journal essay argues that non-membership explains Israel’s failure to pursue civilian nuclear power and that small modular reactors and microreactors justify renewed exploration; this is an advocacy assessment, not an adopted government policy.[33]

Local opposition has focused on planning as well as technology.[23] The Ramat Negev Regional Council opposed the Shivta-area proposal, and local officials criticized consultation and questioned whether the site assessment was current.[23] Questions remained about potential builders, fuel supply, desert cooling, and water availability.[23] A 2017 assessment had already identified geopolitical considerations and public opposition as reasons a station was unlikely in the near future.[2]

The broader nuclear-ambiguity debate also shapes discussion.[34] Adam Raz’s 2016 historical analysis presents ambiguity as an early-1960s compromise among policymakers and argues that secrecy restricted public debate about civilian electricity and desalination reactors.[34] Historical records contain differing descriptions of Dimona’s purpose: a 1961 U.S. assessment reported Israel’s stated precursor-to-power-stations rationale while assessing potential experience relevant to plutonium production.[35] Israeli and French assurances described peaceful purposes, and visiting U.S. scientists reported that the facilities matched the scope and peaceful character previously presented to them.[10][36] Their account also identified concerns about supplier boycotts, sabotage, and disclosure of scientific capabilities as explanations for secrecy.[36] These historical assurances and assessments are distinct from evidence that a commercial electricity station was constructed.[1]

Sources

  1. 1Ynet, The Nuclear Renaissance: How AI Revived the Energy Source Everyone Had Already Written Off, accessed on November 1, 2026.
  2. 2Institute for National Security Studies, Securing the Electrical System in Israel: Proposing a Grand Strategy, accessed on November 1, 2026.
  3. 3Institute for National Security Studies, Securing Israel’s Electricity System: Renewable Energy, Decentralization, and Climate Security, accessed on November 1, 2026.
  4. 4Ministry of Energy and Infrastructure, Pathway for Israel's Energy Sector by 2050, accessed on November 1, 2026.
  5. 5Institute for National Security Studies, Israel and the Global Race for Artificial Sun, accessed on November 1, 2026.
  6. 6Institute for National Security Studies, Nuclear Reactor Safety, accessed on November 1, 2026.
  7. 7Jewish Virtual Library, Israel Atomic Energy Commission, accessed on November 1, 2026.
  8. 8Office of the Historian, Historical Documents, accessed on November 1, 2026.
  9. 9Encyclopaedia Britannica, Dimona Nuclear Research Centre, accessed on November 1, 2026.
  10. 10Jewish Virtual Library, Letter on Israeli Policy Regarding Dimona Reactor (January 1961), accessed on November 1, 2026.
  11. 11Jewish Virtual Library, Lyndon Johnson Administration: Statement on the Desalting of Sea Water, accessed on November 1, 2026.
  12. 12Jewish Virtual Library, Lyndon Johnson Administration: Memorandum on Dimona Inspection and Nuclear Proliferation in the Near East, accessed on November 1, 2026.
  13. 13Office of the Historian, Historical Documents, accessed on November 1, 2026.
  14. 14Globes, Cabinet to discuss Negev nuclear power plant, accessed on November 1, 2026.
  15. 15Israel Hayom, The next big thing: Floating nuclear power plants, accessed on November 1, 2026.
  16. 16Ynetnews, Israel wants nuclear power plant, accessed on November 1, 2026.
  17. 17EveryCRSReport, CRS, Nuclear Weapons R&D Organizations in Nine Nations, 2011, accessed on November 1, 2026.
  18. 18The Jerusalem Post, IEC, IAEC to develop nuclear infrastructure, accessed on November 1, 2026.
  19. 19Ynetnews, Gov't reexamining nuclear power plant, accessed on November 1, 2026.
  20. 20Congress.gov, CRS, Managing the Nuclear Fuel Cycle, accessed on November 1, 2026.
  21. 21CTech by Calcalist, Israel's Nuclear Power Plant Is Back on the Table, accessed on November 1, 2026.
  22. 22Globes, Israel feeling its way to nuclear energy, accessed on November 1, 2026.
  23. 23Ynetnews, Israel selects site for first nuclear power plant, accessed on November 1, 2026.
  24. 24Globes, The Planning Committee Determined a New Location for a Future Nuclear Power Plant, accessed on November 1, 2026.
  25. 25Ynetnews, Energy minister: ‘We are examining the construction of a nuclear power plant in Israel’, accessed on November 1, 2026.
  26. 26Ynet, What Happens in the Soreq Reactor?, accessed on November 1, 2026.
  27. 27Ynet, The Soreq Nuclear Reactor Will Close in About 8 Years, accessed on November 1, 2026.
  28. 28EveryCRSReport, Nuclear Weapons R&D Organizations in Nine Nations, accessed on November 1, 2026.
  29. 29Library of Congress, Regulation of Nuclear Safety and Radioactive Materials, accessed on November 1, 2026.
  30. 30U.S. Department of State, Israel National Progress Report, March 2014, accessed on November 1, 2026.
  31. 31CTech by Calcalist, Israel explores nuclear fusion as data centers drive demand for power, accessed on November 1, 2026.
  32. 32Jerusalem Institute for Policy Research, Expert Knowledge Base, accessed on November 1, 2026.
  33. 33Sapir, Building Israel’s Trillion-Dollar Economy | SAPIR Journal, accessed on November 1, 2026.
  34. 34Institute for National Security Studies, Adam Raz, The Routinization of Nuclear Ambiguity, accessed on November 1, 2026.
  35. 35Office of the Historian, Historical Documents, accessed on November 1, 2026.
  36. 36Jewish Virtual Library, U.S. Scientists' Visit to Israel's Dimona Reactor (May 1961), accessed on November 1, 2026.

IsraelPedia Question & Answers

  • What is nuclear power in Israel?

    Nuclear power in Israel refers to proposals for civilian electricity generation, separate from the country’s established nuclear research activities. As of May 2026, Israel had no commercial nuclear reactors generating electricity, although a possible plant near Shivta in the Negev had been discussed and land reserved. Government planning has examined nuclear power in conditional scenarios for 2050.

  • How did Israel’s early nuclear research develop?

    Prime Minister David Ben-Gurion established the Israel Atomic Energy Commission on June 13, 1952, to advise the government on nuclear policy and research and to implement government policy. A 1957 committee considered large reactors for industrial electricity but rejected them because of their expense, choosing a research reactor instead. The Soreq Nuclear Research Center was founded in 1958, and its research reactor began operating in 1960.

  • What were Israel’s early proposals for nuclear power and desalination?

    In 1964, a U.S. team began discussions with Israeli representatives to investigate the technical and economic feasibility of a combined nuclear-power and seawater-desalination plant. A proposal circulated in 1967 envisioned three large nuclear plants, including two on Israel’s Mediterranean coast, with the first producing the equivalent of approximately 450 million gallons of fresh water daily. These were feasibility discussions and proposals, not completed installations.

  • What nuclear power plans did Israel consider from 2007 onward?

    From 2007 onward, Israeli officials and agencies repeatedly considered a possible civilian station, including a proposed 1,200-megawatt plant and a possible site in the southern Negev. In 2010, the Israel Electric Corporation and the Israel Atomic Energy Commission agreed to develop engineering and technical infrastructure for a possible future plant, partly to preserve expertise. Later studies and site reservations did not amount to approval to build a station.

  • What site has been proposed for a future nuclear power station in Israel?

    A 2025 proposal identified an area near Shivta in the Negev for review, while a separate planning development recommended advancing Rogem, approximately twelve kilometers north of the earlier proposed location, for consideration by the National Planning and Building Council. The Rogem recommendation followed concerns about suspected geological faults at the earlier site. Neither development was a government decision to build a station.

  • What is the difference between Israel’s research reactors and a nuclear power station?

    Israel’s research centers at Soreq and near Dimona are distinct from commercial electricity-generating stations in both purpose and reactor scale. Soreq’s five-megawatt reactor has been used for training and research in areas including reactor physics, radiography, and neutron diffraction, rather than to supply commercial electricity. Dimona’s activities have included research-reactor and nuclear-waste-disposal functions, not operation as a commercial generating station.

  • How does nuclear power fit into Israel’s long-term energy planning?

    The Ministry of Energy and Infrastructure’s 2050 roadmap treats nuclear power as an option under early evaluation, not as an approved construction plan. It estimates that land constraints and safety distances would limit nuclear capacity to approximately 15–20% of demand, so nuclear generation would need to operate alongside other energy sources. A conditional scenario assumes nuclear plants operating by 2050, but depends on technological development, policy decisions, economic analysis, and public discussion.