← All articles

Total current articles · 5,967

Leviathan Gas Field

Published

01In brief

Leviathan Gas Field is an offshore natural-gas field in Israel’s exclusive economic zone in the eastern Mediterranean, west of Haifa. Announced in December 2010 with an initial estimated resource of 16 trillion cubic feet, it was described at the time as the world’s largest deepwater gas discovery in a decade. Production began on December 31, 2019, linking the offshore reservoir through a near-shore processing platform to Israel’s national gas grid. The field supplies Israel, Egypt, and Jordan and has become the basis for major regional export agreements and successive production-expansion projects.

02Overview and Location

Leviathan combines a large deepwater gas reservoir with production infrastructure that brings gas to Israel’s coast and supports domestic consumption and regional exports.[1][4] Its development substantially expanded Israel’s potential gas supply: the initial development phase was designed for approximately 12 billion cubic meters annually, while later expansion plans sought substantially greater throughput.[6] Anticipated benefits at the start of production included greater energy independence and reduced reliance on coal, although the scale of future production depended on domestic demand, export markets, and supply agreements.[6]

The field lies approximately 120 kilometers west of Haifa and 35 kilometers west of the Tamar field, according to the location used in the 2025 environmental assessment.[1] A 2019 technical abstract placed it about 130 kilometers west of Haifa, while early accounts commonly described the distance as approximately 80 miles offshore.[7][2] The 2025 assessment gives water depths of approximately 1,600–1,700 meters in its overview and a broader range of 1,540–1,800 meters across the lease area.[1]

The reservoir and its processing platform occupy markedly different offshore environments: the gas field is far offshore in deep water, whereas the Leviathan Production Platform is approximately 10 kilometers west of Dor Beach.[1] Gas travels from subsea wells to the platform for processing before entering the national transmission network through facilities at Dor.[1] Condensate is stabilized on the platform and transported separately by pipeline toward refineries.[1]

Leviathan was characterized in a 2019 technical abstract as the largest natural-gas field discovered in the Eastern Mediterranean and one of the world’s largest deepwater gas discoveries.[7] Its regional role is reflected in long-term supply arrangements with Egypt and Jordan, including access through Egypt to liquefied-natural-gas facilities that can serve more distant markets.[8]

03Discovery and Appraisal

Leviathan’s exploratory well reached its target gas-bearing strata in November 2010, when the partners reported preliminary indications of gas at a depth of 5,100 meters.[9] At that stage, the quantity and quality of the gas and the discovery’s economic viability had not yet been determined.[9] Exploration followed a three-dimensional seismic survey that indicated a possible 453 billion cubic meters of gas and a 50 percent geological chance of success.[10]

Noble Energy announced the significant discovery on December 29, 2010, reporting an initial estimate of 16 trillion cubic feet.[2] The discovery venture comprised Noble Energy as operator, Delek Drilling, and Ratio Oil Exploration.[7] Leviathan followed the discovery of Tamar in 2009, both involving the American company and Israeli partners; Israel relied on international companies for expertise in offshore exploration and production.[11]

An early technical description identified Leviathan as Noble Energy’s third and largest natural-gas discovery off Israel’s northern coast.[12] The initial 16-trillion-cubic-foot figure was a resource-base estimate, and at least two further appraisal wells were considered necessary to define it more accurately.[12] Resources were distinguished from reserves, meaning quantities that could be produced using prevailing technology and prices.[12]

Subsequent estimates varied as appraisal and development proceeded.[7][10] A 2017 development report gave 18.9 trillion cubic feet, equivalent to 535 billion cubic meters, together with 34.1 million barrels of condensate.[13] By 2019, a technical abstract estimated more than 33 trillion cubic feet of gas in place, of which more than 21 trillion cubic feet was recoverable.[7] A separate 2019 account gave 934 billion cubic meters in place and 605 billion cubic meters recoverable, while a production-launch report cited the partners’ estimate of 22 trillion cubic feet of recoverable gas.[10][6]

The distinction between gas in place and recoverable gas is important to these figures: the 2019 technical estimate explicitly separated the larger total contained in the reservoir from the smaller recoverable quantity.[7] A January 2026 investment announcement reported a reservoir estimate of 635 billion cubic meters.[14]

04Licensing and Development

In 2014, the government issued a license covering Leviathan North and Leviathan South, each described as an area of 250 square kilometers.[15] The license required guaranteed capacity of 9.2 billion cubic meters annually for Israel’s economy and systems capable of delivering 12 billion cubic meters a year to the Israeli coast.[15] It also empowered the Petroleum Commissioner to require expanded production and delivery systems to help ensure safe and reliable supply to Israeli consumers.[15]

Domestic supply received explicit protection in the license conditions.[15] During a shortage, domestic needs were to take priority over uncontracted supply capacity, and exports were restricted if they would reduce capacity available to the domestic network below 9.2 billion cubic meters annually.[15] At the time, exporting more than 7 billion cubic meters a year was reported to require an annual production plan of 16 billion cubic meters.[15]

The project’s regulatory arrangements were revised during 2015–2016, and a new government-company agreement was negotiated in late May 2016 following a Supreme Court ruling.[16] The Israeli government approved Leviathan’s development on June 2, 2016.[17] Development was then expected to cost at least $5 billion, and the partners needed sales agreements to help secure additional financing.[17][18] One contemporary estimate envisaged expenditure of $5–6 billion before the first gas reached shore.[18]

An initial development investment of $3.75 billion was approved on February 23, 2017.[17] Reporting on the development decision described financing secured for a project of nearly $4 billion, with first gas targeted for the end of 2019.[13] Noble Energy then held approximately 39.7 percent, with Delek Drilling, Avner Oil Exploration, and Ratio Oil among the other owners.[17]

Construction planning linked four high-rate subsea production wells to a fixed-leg processing platform.[7] By 2018, seabed pipelines had been laid, while the platform was being completed in Texas for installation near Israel’s coast.[19] Production began on December 31, 2019, after years of development delays.[3] Gas passed through the offshore processing facilities, reached the mainland at Dor, and entered Israel’s national grid.[3]

05Production Infrastructure

The first development phase consisted of four production wells, each planned for an average depth of about five kilometers below sea level and a production capacity of 300 million cubic feet per day.[10] Together, they were expected to support approximately 12 billion cubic meters of annual production.[10] The initial system’s planned daily capacity was 1.2 billion cubic feet.[7]

The production platform was installed about 10 kilometers offshore in water 86 meters deep.[10] Its processing decks also accommodate workers and contain utilities for power generation, desalination, and waste treatment.[10] Early construction descriptions envisaged two approximately 120-kilometer subsea pipelines carrying gas from the field to the platform, followed by a pipeline connection to the national transmission system.[10]

The more detailed 2025 environmental assessment describes two gathering lines approximately 118 kilometers long and 18 inches in diameter.[1] Gas is processed on the platform and conveyed through offshore and onshore pipelines to the Israel Natural Gas Lines Dor Valve Station.[1] Stabilized condensate travels to the Coastal Valve Station and onward to refineries.[1] The assessment listed five producing wells at that time: Leviathan 3, 4, 5, 7, and 8.[1]

The existing Domestic Supply Module could process up to 1,200 million standard cubic feet daily, according to the same assessment.[1] A third gathering line, scheduled in that document for installation in 2025, would enable the module to receive and process up to 1,400 million standard cubic feet daily.[1] A May 2026 report subsequently described the third pipeline and associated platform-system work as completed and reported annual field capacity of 15.8 billion cubic meters, exceeding the previously expected 14 billion.[4]

Higher production capacity did not eliminate all constraints on deliveries.[4] Pipeline and export-conveyance bottlenecks remained in May 2026, and domestic requirements continued to take precedence over exports of remaining available quantities.[4]

06Ownership and Operating Performance

By June 2024, the reported ownership structure was NewMed Energy with 45.3 percent, Chevron with 39.66 percent, and Ratio Oil Corp. with 15 percent.[20] Chevron operated the field, while Israeli companies held the majority interest.[21] A May 2026 account rounded the partners’ holdings to NewMed Energy at 45 percent, Chevron at 40 percent, and Ratio at 15 percent.[4]

Leviathan produced 11.4 billion cubic meters in 2022.[22] For context, Israel’s total gas production that year was 21.92 billion cubic meters, with 9.21 billion exported and 12.71 billion consumed domestically.[22] Those national figures include production from other fields and are not Leviathan-only sales or export totals.[22]

In June 2024, the field was reported as supplying up to 1.2 billion cubic feet daily, or approximately 12 billion cubic meters annually, to Israel, Egypt, and Jordan.[20] Actual production during 2024 totaled 11 billion cubic meters, about half of which was exported to Egypt, with the balance divided between Israel’s domestic economy and Jordan.[5] The partners reported production of 10.9 billion cubic meters in 2025 and revenue of $2.23 billion.[14]

Domestic sales agreements formed part of the project’s early commercial foundation.[16] In late May 2016, the partners signed an 18-year agreement valued at $3 billion to supply up to 459 billion cubic feet to a privately operated power plant in central Israel.[16] An agreement signed with power producer Edeltech in January provided for 212 billion cubic feet over 18 years and was valued at $1.3 billion.[16] Projected initial daily production was considered sufficient to meet both domestic agreements.[16]

07Regional Trade and Export Agreements

Fifteen-year natural-gas export deals with Egypt and Jordan using Leviathan gas took effect in 2020.[8] These arrangements supported government-to-government cooperation, although they faced domestic opposition in both importing countries connected to the history of Arab-Israeli conflict and the Palestinian issue.[8] Some gas covered by the Egyptian agreement flows by pipeline to Egypt’s two LNG liquefaction facilities.[8]

The Jordanian relationship developed before production began.[17] In September 2016, the Jordan Electric Power Company finalized negotiations for supply from the Leviathan consortium under an agreement valued at $10 billion through 2031.[17] The planned export route involved a new pipeline section connecting to existing infrastructure.[19] At the start of operations in December 2019, most of the gas initially expected to flow was designated for Jordan’s electricity company, with supplies to private Egyptian customers also planned.[23]

In February 2018, Noble Energy, Delek Drilling, and their partners announced agreements with Egypt’s Dolphinus Holdings covering a combined 64 billion cubic meters from Leviathan and Tamar.[17] These agreements were described as worth $15 billion over the following decade.[17] Gas began flowing from Israel to Egypt in January 2020.[17] A later account described Leviathan’s initial Egyptian agreement as covering 60 billion cubic meters and reported that the partners had supplied 23.5 billion cubic meters to Egypt by August 2025.[24]

Export infrastructure evolved alongside the contracts.[17] In January 2021, Chevron and its partners agreed to invest approximately $235 million in pipeline expansion, including a new Ashdod–Ashkelon pipeline, to support Egyptian exports.[17] An agreement involving Israel, Egypt, and the European Union in June 2022 provided for Israeli gas to travel by pipeline to Egyptian ports for possible export to Europe.[17]

The economic logic of the Egyptian route included liquefaction and potential onward shipment by tanker.[25] Earlier planning also examined adapting existing pipelines, an option that could avoid the cost and environmental concerns associated with constructing a coastal LNG export plant.[19] At the end of 2019, lower international gas prices and uncertainty over Egyptian LNG production were among the factors complicating the project’s economics.[25]

08Expansion and Long-Term Supply

In August 2025, Leviathan’s partners announced an agreement to sell Egypt 130 billion cubic meters of gas for $35 billion, describing it as Israel’s largest gas export deal.[5] The reported term extended through 2040 or until the contracted quantities were supplied.[24] The initial 20 billion cubic meters was expected to begin in 2026, followed by another 110 billion from 2029 after production expansion and construction of a new transmission pipeline.[24] At the announcement stage, final approval from the Petroleum Commissioner was still required.[5]

A later account dated the signing of the major Egyptian supply agreement to December 17, 2025, and described planned infrastructure investment of NIS 15–16 billion.[17] Prime Minister Benjamin Netanyahu estimated that the agreement would generate NIS 58 billion in state revenues.[17] The supply arrangement depended on additional pipelines and expansion of Leviathan, with the expanded project expected to support domestic supply and regional exports through 2064.[17]

Expansion planning had already advanced in 2024, when the partners received preliminary approval for an additional 118 billion cubic meters of exports beyond the 105 billion then permitted by the regulator.[20] Their plans sought annual production of approximately 21 billion cubic meters.[20] A contemporary preliminary proposal was described as a $500 million expansion, with additional output still several years away.[21]

The 2025 environmental assessment described three proposed additional wells—Leviathan-10, Leviathan-11, and Leviathan-23—together with subsea production trees, new infield flowlines, and related infrastructure.[1] The selected wells were intended both to provide high-confidence production and to help delineate the reservoir for future development.[1] The assessed plan envisaged production capacity of up to 2,100 million standard cubic feet daily.[1] Installation of a planned Regional Export Module was then scheduled for late 2028 to early 2029, with its environmental assessment to be handled separately.[1]

In January 2026, the partners announced a final investment decision of $2.36 billion for expansion, scheduled for completion in 2029.[14] The project was reported as raising annual capacity from 12 to 21 billion cubic meters through additional wells, subsea systems, and expanded platform-handling systems.[14] The separate capacity improvement reported in May 2026 brought capacity to 15.8 billion cubic meters annually, rather than establishing that the full 21-billion-cubic-meter expansion had been completed.[4]

09Security and Supply Disruptions

Leviathan’s near-shore processing platform appeared in a video released by Hezbollah leader Hassan Nasrallah that showed its coordinates and images.[21] Although the reservoir is far offshore, the processing platform lies only a few miles from Zichron Yaakov and was identified as being within reach of Hezbollah missiles.[21]

The field stopped operating when the Iran campaign began on February 28, 2026, in a precaution intended to reduce the risk of offshore installations being hit.[26] Leviathan remained inactive for 32 days and resumed operations in early April, again supplying Israel, Egypt, and Jordan.[26] During the disruption, Leviathan and Karish were both closed, while gas from Tamar was redirected toward domestic use at the expense of export commitments.[27]

Tamar was the only offshore field operating during the stoppage, and Israel increased its use of coal and diesel for electricity generation.[26] Egypt and Jordan faced energy pressure from disrupted Israeli supplies, making export reliability and regional supply needs part of the considerations surrounding Leviathan’s return to operation.[26] The Energy Ministry also stated that domestic supply would increase following integration of another platform into the production system.[26]

The interruption illustrated the connection between offshore production security, Israel’s electricity-fuel choices, and neighboring countries’ access to pipeline gas.[26][27] The restart restored deliveries, while the subsequent May report still identified transmission and export-conveyance bottlenecks as limitations on the benefits of greater production capacity.[26][4]

10Regulatory and Environmental Disputes

The Antitrust Authority announced in December 2014 that it would not approve a consent decree for Leviathan’s development because of concerns about monopolistic effects.[11] A government committee proposed changes to Noble Energy’s and Delek Group’s holdings in Leviathan and Tamar in February 2015, but both companies initially rejected the proposal.[11] In March 2016, the Supreme Court invalidated the government’s agreement because it insufficiently protected future governments’ flexibility to change prices and other key terms; a revised agreement followed in May.[16] Critics continued to challenge market concentration and consumer prices, while the government emphasized development and regional exports.[23]

Environmental opposition focused on the platform’s proximity to shore, emissions, and the consequences of a possible condensate spill.[19][28] In 2018, campaigners camped at Dor Beach and advocated a floating facility above the reservoir; counterarguments emphasized mitigation measures, seabed conditions, and defensibility.[19] In December 2019, six local authorities sought to stop a platform test, but the Jerusalem District Court allowed it after finding that they had not supplied professional testimony refuting state professionals’ safety opinions.[28] A scientific study criticized the company’s emissions modeling; Noble rejected the findings and said it was installing emissions-control technology.[28] Other opponents argued for a direct transition to renewable energy rather than greater dependence on gas.[6]

The 2025 environmental assessment classified most residual risks to most assessed resources as low, while identifying potential moderate residual effects of drilling discharges on water quality, fish, sediments, and benthic communities.[1] Resource estimates also generated disagreement: a 2015 ministry-commissioned assessment estimated 16.5 trillion cubic feet against the partners’ consultant’s earlier 21.9 trillion; the ministry said its assessment was not final, and the partners disputed it.[29]

Early Lebanese political claims surrounding regional gas discoveries were denied by Israel, and Leviathan and Tamar were outside the disputed maritime area.[2][16] Israel and Lebanon finalized a U.S.-facilitated permanent maritime boundary agreement on October 27, 2022.[30]

Sources

  1. 1Israel Ministry of Energy, CSA Ocean Sciences Environmental Assessment, accessed on November 26, 2026.
  2. 2The Washington Institute for Near East Policy, accessed on November 26, 2026.
  3. 3Center for Israel Education, The Obstacles Still Facing Israel’s Leviathan Gas Field, accessed on November 26, 2026.
  4. 4Globes, Leviathan production capacity exceeds expectations, accessed on November 26, 2026.
  5. 5Globes, Leviathan partners sign $35b Egyptian gas export deal, accessed on November 26, 2026.
  6. 6The Times of Israel, accessed on November 26, 2026.
  7. 7Ben-Gurion University of the Negev, The leviathan field - Nine years since discovery and nearing first gas, accessed on November 26, 2026.
  8. 8Congress.gov, Congressional Research Service, accessed on November 26, 2026.
  9. 9Globes, Leviathan partners report signs of gas, accessed on November 26, 2026.
  10. 10Globes, Leviathan production platform set to reach Israel, accessed on November 26, 2026.
  11. 11Congress.gov, Congressional Research Service, accessed on November 26, 2026.
  12. 12Congress.gov, Congressional Research Service, accessed on November 26, 2026.
  13. 13The Times of Israel, accessed on November 26, 2026.
  14. 14Globes, Leviathan partners to invest $2.36b to expand production, accessed on November 26, 2026.
  15. 15Globes, Leviathan partners granted license, accessed on November 26, 2026.
  16. 16Congress.gov, Congressional Research Service, accessed on November 26, 2026.
  17. 17Jewish Virtual Library, Israel Science & Technology: Oil & Natural Gas, accessed on November 26, 2026.
  18. 18The Washington Institute for Near East Policy, accessed on November 26, 2026.
  19. 19The Washington Institute for Near East Policy, accessed on November 26, 2026.
  20. 20The Times of Israel, accessed on November 26, 2026.
  21. 21The Washington Institute for Near East Policy, accessed on November 26, 2026.
  22. 22The Washington Institute for Near East Policy, accessed on November 26, 2026.
  23. 23Globes, Will Leviathan cut energy prices, increase competition?, accessed on November 26, 2026.
  24. 24The Times of Israel, accessed on November 26, 2026.
  25. 25The Washington Institute for Near East Policy, accessed on November 26, 2026.
  26. 26Globes, Leviathan gas field resumes operations, accessed on November 26, 2026.
  27. 27Begin-Sadat Center for Strategic Studies, The Other Iranian Energy Crisis: How Israeli Gas Disruptions Will Reshape East Mediterranean Energy Infrastructure, accessed on November 26, 2026.
  28. 28The Times of Israel, accessed on November 26, 2026.
  29. 29Globes, New report sees 20% less gas reserves in Leviathan, accessed on November 26, 2026.
  30. 30U.S. Department of State, Historic Agreement Establishing a Permanent Israel-Lebanon Maritime Boundary, accessed on November 26, 2026.

IsraelPedia Question & Answers

  • What is the Leviathan Gas Field?

    The Leviathan Gas Field is an offshore natural-gas field in Israel’s exclusive economic zone in the eastern Mediterranean, west of Haifa. Announced in December 2010 with an initial estimated resource of 16 trillion cubic feet, it was described at the time as the world’s largest deepwater gas discovery in a decade. Production began on December 31, 2019, and the field supplies Israel, Egypt, and Jordan.

  • How was the Leviathan Gas Field discovered?

    An exploratory well reached gas-bearing strata in November 2010 after a three-dimensional seismic survey indicated a possible 453 billion cubic meters of gas and a 50 percent geological chance of success. Noble Energy announced the significant discovery on December 29, 2010, with an initial estimate of 16 trillion cubic feet. At that stage, the quantity and quality of the gas and the discovery’s economic viability had not yet been determined.

  • How does the Leviathan Gas Field deliver gas to shore?

    Gas from the Leviathan Gas Field travels through subsea wells and gathering lines to an offshore processing platform about 10 kilometers west of Dor Beach. After processing, it moves through offshore and onshore pipelines to the Israel Natural Gas Lines Dor Valve Station and Israel’s national transmission network. Stabilized condensate is transported separately toward refineries.

  • Who owns and operates the Leviathan Gas Field?

    By June 2024, NewMed Energy held 45.3 percent of the Leviathan Gas Field, Chevron held 39.66 percent, and Ratio Oil Corp. held 15 percent. Chevron operated the field, while Israeli companies held the majority interest. A May 2026 account rounded the ownership shares to 45 percent, 40 percent, and 15 percent, respectively.

  • How much gas did the Leviathan Gas Field produce in 2024?

    The Leviathan Gas Field produced 11 billion cubic meters of gas in 2024. About half was exported to Egypt, with the balance divided between Israel’s domestic economy and Jordan. In 2025, the partners reported production of 10.9 billion cubic meters and revenue of $2.23 billion.

  • What are the Leviathan Gas Field’s export agreements with Egypt?

    The Leviathan partners announced an agreement in August 2025 to sell Egypt 130 billion cubic meters of gas for $35 billion, describing it as Israel’s largest gas export deal. The agreement was reported to extend through 2040 or until the contracted quantities were supplied. The first 20 billion cubic meters was expected to begin in 2026, with another 110 billion from 2029 after production expansion and construction of a new transmission pipeline.

  • Why did the Leviathan Gas Field stop operating in 2026?

    The Leviathan Gas Field stopped operating when the Iran campaign began on February 28, 2026, as a precaution to reduce the risk of offshore installations being hit. It remained inactive for 32 days and resumed operations in early April, again supplying Israel, Egypt, and Jordan. During the stoppage, Tamar was the only offshore field operating, and Israel increased its use of coal and diesel for electricity generation.