Israel Railways

Published

01In brief

Israel Railways is a government-owned company that operates Israel’s intercity passenger trains and freight services and develops, manages, and maintains the national railway infrastructure. From a system carrying only a few million passengers annually, its passenger business grew to roughly 70 million journeys a year by the mid-2020s. In 2025, it served 67 passenger stations and recorded 71.8 million passenger journeys. Its development has encompassed the modernization of inherited Ottoman- and British-era infrastructure, the electrified Jerusalem–Tel Aviv connection, and a long-term expansion program intended to improve links among Israel’s cities, peripheral communities, and ports.

02Overview

Israel Railways Ltd. is wholly owned by the State of Israel and is the country’s sole operator of intercity passenger trains.[1] Its responsibilities extend beyond running trains to developing, managing, and maintaining railway infrastructure and related equipment, transporting freight, and conducting commercial activity at station sites.[1] Both its ongoing operations and its development activities receive state subsidies.[1]

Daily passenger services extend from Nahariya and Beit She’an in the north to Jerusalem, Beersheba, and Dimona.[1] Freight operations connect industrial and mineral-producing areas with terminals and seaports, with particularly important flows between the southern Tzefa area and Ashdod Port and between the ports of Haifa and Ashdod.[1] During 2025, rail connections were completed to all five ports identified in the company’s reporting: Haifa Port, Ashdod Port, South Port, Bay Port, and the Shipyards Port.[1]

The system’s development contrasts sharply with its limited role during Israel’s early decades, when inherited British infrastructure and equipment supported a service used mainly for tourism rather than everyday public transportation.[2] Subsequent investment in infrastructure and modern railway cars helped increase annual passenger journeys from a few million to more than 70 million.[2] Electrification and the 2040 development program seek further increases in capacity, faster journeys, and stronger connections with other public-transport systems.[1]

03Origins and Early Railway Development

The Jaffa–Jerusalem railway, an important predecessor of the modern network, originated in an Ottoman concession granted to Joseph Navon in 1888.[3] Navon transferred the concession to a French company he founded in France in return for one million francs, and later received the Ottoman title of bey in recognition of his development work.[3]

The first passenger train from Jaffa arrived in Jerusalem on August 27, 1892, with an official opening ceremony following in September.[4] The approximately 53-mile route used rails imported from Belgium and coal brought from Britain.[4] Jerusalem’s first railway station opened on September 26, 1892, as part of the French company’s concession-built, one-metre-gauge line.[5] The railway substantially reduced travel time: one account contrasts a seven-hour camel journey with a three-hour train trip.[6] American consul Selah Merrill recalled in 1893 that during the previous August, “tens of thousands of people, for the first time in their lives, have seen a railroad and a train of cars.”[4]

British authorities converted the Jaffa–Jerusalem line to standard gauge in 1920 and undertook major renovations in 1923 to accommodate freight as well as passenger transport.[5] The original Jerusalem station, an important Ottoman-era public building, ceased railway operations in 1998 and subsequently reopened as a cultural center.[6]

A separate strand of railway development involved extensions associated with the Hejaz Railway.[7] Competition among railway companies delayed or prevented proposed connections, including a plan linking Afula with Jerusalem.[7] Its first 17-kilometer section reached Jenin in 1913; during World War I, the line extended to Tulkarm and Lod, connecting there with the Jaffa–Jerusalem railway and a line toward the Sinai Peninsula.[7]

The Hejaz Railway supported Jewish settlement before independence by carrying construction materials for communal villages and helping sustain population growth in remote northern areas.[7] It also became a target of robberies and terrorism.[7] Immediately after World War II, Jewish resistance movements damaged much of the Valley railway in efforts to weaken the British Mandate, cutting the Jezreel Valley section off from extensions to the east and south.[7] After independence, Israel Railways took over the railway system, but the Emek line was discontinued because of modernization and maintenance costs.[7]

04State Railway and Corporate Reorganization

During the War of Independence, the British Palestine Railway Company became Israel Railways, a government-owned railway enterprise regarded by railway management and the state as important to the Zionist project.[8] For the first four decades after Israel’s establishment, the railway continued to rely on infrastructure and equipment inherited from the British.[2]

In 1986, the government-run network comprised 528 kilometers connecting Jerusalem, Tel Aviv, Haifa, and Beersheba.[9] It carried 2,814,000 passenger journeys and 6,086,000 tons of freight in 1985, with phosphates, grains, coal, and potash forming the principal freight categories.[9] Road transport generally offered faster journeys: in 1986, trucks or cars were faster on every line except Haifa–Tel Aviv, where road and rail travel times were equal.[9] Long-term government proposals included extending the Beersheba line along the Dead Sea and south to Eilat and developing a rapid rail connection from Petah Tiqwa to Tel Aviv.[9]

Investment subsequently emphasized commuting and the improvement of existing routes, including Nahariya–Haifa–Tel Aviv, alongside new services such as Tel Aviv–Beersheba.[10] Passenger journeys rose from approximately 5.5 million in 1996 to 9 million in 1999 and 13 million in 2000.[10] A contemporary forecast anticipated 40 million journeys within the following five years, but this was a projection rather than a recorded result.[10]

A November 2001 snapshot recorded approximately 570 kilometers of main lines and 336 kilometers of branch lines.[10] The fleet then included 50 locomotives, 71 passenger cars, 24 self-propelled diesel passenger cars, and about 1,300 freight cars.[10] More than 200 passenger trains and over 100 freight trains operated daily, according to the figures published for that period.[10]

Organizationally, the railway began as a unit of the Ministry of Transport.[11] In 1988 it joined the Ports Authority, which was renamed the Ports and Railways Authority.[11] A December 1996 government decision provided for transferring railway activity to a government-owned company, and Israel Railways Ltd. was incorporated in January 1998.[11] Government Resolution 2308 of July 30, 2002, addressed making Israel Railways a limited company.[2] Following legislative changes and a labor agreement, the company began operating separately from the Ports and Railways Authority in July 2003.[1]

Israel Railways remains among the companies overseen by the Government Companies Authority, whose responsibilities include supervision, privatization, and structural changes involving state-owned enterprises.[12] Later government resolutions addressed an outline agreement with the company in 2014 and bond raising in 2016.[2]

05Jerusalem and Regional Network Renewal

Work on the new Tel Aviv–Jerusalem railway, designated Line A1, began in 2006 after planning associated with the closure of the older line in 1998.[2] The older line was renovated and reopened in 2001, while rail service to and from Jerusalem resumed in 2005 without freight transport.[2][13] Regular electric passenger service on the new line began on September 25, 2018, replacing service to the former Malha and Jerusalem Zoo stations.[11][13]

Construction of the final tunnel portion of the new connection began on October 6, 2014.[14] At that stage, the project was described as providing a planned 28-minute journey at speeds of up to 160 kilometers per hour, with operations forecast for late 2017.[14] Those figures represented the project’s expectations at the time rather than its eventual opening date or achieved timetable.[14]

At first, Jerusalem’s Yitzhak Navon station connected the city only with Ben-Gurion Airport, where passengers continuing to Tel Aviv had to change trains.[15] End-to-end electric service to Tel Aviv’s HaHagana station began in December 2019.[16] The 56-kilometer route included an 11.6-kilometer tunnel and a 1.25-kilometer bridge, while Navon station was built 80 meters underground.[16] At the opening of the through service, journey times were reported as 32–34 minutes, and the official project cost was NIS 6.9 billion, with other estimates reaching NIS 9 billion.[16]

By December 2021, passengers could travel from Jerusalem as far as Herzliya without changing trains.[15] Depending on the Tel Aviv destination station, the journey from Navon took approximately 30–45 minutes, and about 35 trains departed Jerusalem for Tel Aviv on regular weekdays.[15]

Passenger figures illustrate both the new connection’s growth and the interruption of service in 2020.[15] In the fourth quarter of 2018, 409,580 passengers traveled from Jerusalem to Ben-Gurion Airport, some continuing to Tel Aviv, while the old Jerusalem–Tel Aviv route recorded 420,010 passengers, including those traveling only part of the route.[15] For comparison, the Tel Aviv–Binyamina section carried 3,328,780 passengers and Tel Aviv–Haifa carried 2,794,270 in the same quarter.[15]

Jerusalem–Tel Aviv passenger numbers reached 752,960 in the first quarter of 2020.[15] Passenger transport was suspended in the second quarter, stopping completely during April and May, before resuming in the third and fourth quarters.[15] Fourth-quarter traffic via Ben-Gurion Airport totaled 352,800 passengers, 53% below the first-quarter figure.[15]

Jerusalem rail service recorded 3,936,352 passenger arrivals and 3,979,903 departures in 2023, respective increases of 21.0% and 21.2% over the previous year.[13] The corresponding 2018 figures were 369,965 arrivals and 400,106 departures.[13] Regional renewal also included the modern Emek line, which opened in 2016 and created opportunities for employment, housing, leisure, and tourism.[7]

06Passenger and Freight Operations

Israel Railways recorded 71.8 million passenger journeys in 2025, which it identified as a record year for demand.[1] Its year-to-year comparison gave 65.4 million journeys for 2024 and a 10% increase in 2025.[1] December 2025 set a monthly record of approximately 7.3 million journeys, while December 21 set a daily record of about 376,000 passengers, exceeding the approximately 366,000 recorded on December 18.[1]

At the end of 2025, passenger services stopped at 67 stations and averaged about 619 trains per day.[11] Average Sunday–Thursday journeys rose from 239,000 in 2023 to 250,000 in 2024 and 279,000 in 2025.[11] Annual adjusted punctuality was 95.39% in 2023, 96.8% in 2024, and 94.05% in 2025.[11] Tel Aviv HaShalom had the highest listed station total in 2025, with 17,209,007 entries and exits combined.[11]

The company’s 2024 annual report recorded 54.7 million passenger journeys in 2022, 62.5 million in 2023, and approximately 65.0 million in 2024; the later 2025 reporting gives the 2024 total as 65.4 million.[17][1] The 2024 report also recorded an average of approximately 610 trains per day and 6.15 million tonnes of freight for that year.[17] These annual totals count journeys rather than unique individuals.[1]

Growing demand has brought capacity pressures: descriptions of conditions in 2023 identified overcrowding on most intercity journeys, a shortage of railway cars, and a network that did not reach the outer periphery.[2] Across 2010–2023, the railway carried millions of passengers without a passenger being killed.[2]

Freight services focus on goods suited to long routes, large volumes, and fixed origins and destinations.[11] Principal commodities include minerals, containers, grain, sand, waste, steel, and aggregates.[11] Terminals are located near Tzefa, Ne’ot Hovav, Ashdod Port, Bnei Brak, Hadera, Haifa Port, Kiryat Gat, and Beit She’an.[11] Earlier descriptions also identified freight service to Ashkelon, Beersheba, and mineral quarries south of Dimona.[14]

In 2025, approximately 49 freight trains operated daily, moving about 6.6 million tonnes over the year, or approximately 23,400 tonnes per operating day.[1][11] Main flows included southern minerals transported from the Tzefa area to Ashdod Port and containers moving to, from, and between Haifa and Ashdod.[11] Transport between those ports accounted for approximately half of container transport.[11] A branch serving South Port opened in September 2024 under a maintenance and operation agreement with Hadarom Container Terminal.[11]

07Electrification and Development Planning

Regular electric passenger service began with the Jerusalem–Ben-Gurion Airport route on September 25, 2018.[11] This followed an initial electrification tender in 2005, its cancellation in 2007, and a new tender in 2015.[2] Subsequent commercial milestones included Jerusalem–Modi’in in March 2022, Netanya–Rehovot in September 2022, and Binyamina–Ashkelon in January 2023.[11] Ashkelon–Ofakim followed on September 17, 2025, and Goral Junction–Beersheba on March 27, 2026.[11]

The electrification program specifies overhead contact infrastructure along approximately 420 kilometers of main lines, 14 traction substations, and a SCADA control system.[11] Related procurement encompasses monitoring systems and new rolling stock.[18] Its stated objectives include shorter journeys, higher frequencies, improved punctuality and comfort, reduced environmental impact, and more efficient service.[1][18] Freight trains are excluded from the program and are expected to retain diesel propulsion.[11] The revised completion estimate in the company’s reporting was 2027.[11]

The government and company approved a strategic railway-development plan for 2040 in July 2017.[18] A 2019 implementation plan revised its estimated cost from approximately NIS 124 billion to NIS 126 billion.[18] Tender background material allocated approximately NIS 95 billion to tracks, stations, freight, and terminals; NIS 10 billion to maintenance facilities and depots; and NIS 19 billion to rolling stock.[18]

The plan envisages connecting Jerusalem, Tel Aviv, Haifa, and Beersheba with trains designed for speeds of up to 250 kilometers per hour.[18] It includes a target of 125 passenger stations by 2040, additional and doubled tracks, expanded freight terminals and maintenance compounds, improved port and public-transport links, and proposed lines toward Kiryat Shmona and Eilat.[18] Its forecasts include 300 million annual passenger journeys and approximately 143,000 tonnes of freight per day in 2040.[18] These are development targets and projections, not descriptions of completed infrastructure or current traffic.[18]

At a February 2025 infrastructure conference, then-chief executive Moshe Jana outlined goals of doubling the amount of track to 2,600 kilometers by 2040 and reaching 105 million passenger journeys in 2030 and 300 million in 2040.[19] A separate 2021–2025 development-budget framework, agreed by the transport and finance ministries on August 2, 2021, totaled approximately NIS 46 billion.[11] Its allocations included coastal railway expansion, the Jerusalem fast line, rolling stock, freight terminals, station upgrades, and electrification, although not all project details, budgets, milestones, implementation stages, or tender divisions had been finalized.[11]

08Public Role and Government Support

The development and operation framework links government subsidies to the company’s passenger-service and infrastructure commitments.[11] Israel Railways signed a new agreement on May 31, 2023, followed by government representatives on June 5.[11] Applying retroactively from January 1, 2022, through December 31, 2026, it replaced an earlier agreement extended through May 21, 2023.[11] It also permits additional payments for activities directed by government representatives.[11]

The agreement’s objectives include making optimal use of infrastructure and equipment, providing an appropriate supply of journeys, improving service quality and connections with other transport modes, maintaining safe infrastructure, adopting new technologies, and strengthening rail freight.[11] Commercial-space leasing is another component of the company’s activities alongside passenger transport, freight, infrastructure, railway systems, and rolling stock.[11]

The railway’s significance includes its capacity for high-volume passenger transport: one train can carry approximately a thousand passengers.[2] Its earlier role in supplying Jewish communities in northern areas and the renewed Emek line’s employment, housing, leisure, and tourism opportunities illustrate the relationship between railway access and regional development.[7] Extending access to peripheral areas is also an explicit focus of the 2022–2026 planning framework described in later tender documentation.[18]

09Controversies

Early railway employment involved tensions between national policy and demand for skilled labor.[8] Most Palestine Railways workers had been Arabs, and Palestinian workers, including some who became refugees in neighboring countries, sought to return to their jobs.[8] The railway’s need for their skills intersected with state policies separating labor markets along ethnic and national lines.[8]

A proposed 2010 reform would have separated track management and maintenance from train operations and opened services to private operators.[20] The proposal drew on British Rail’s privatization model, which was itself characterized as problematic and controversial; some new-line construction had already been assigned to other infrastructure companies.[20]

Electrification delays became another significant public issue.[21] In June 2024, the NIS 12 billion project was officially delayed to July 2027, with 2030 also raised as a possible completion date; approximately 70% of electrical infrastructure had been deployed and electric trains accounted for about 60% of traffic.[21] Contributing factors included work stoppages, war, breakdowns, and disputes over night and Shabbat work, while a revised agreement with contractor SEMI added €30 million and reduced night and weekend work.[21]

A Government Companies Authority comparison of 2019 and 2025 found wage expenses rising 60%, from NIS 1.05 billion to NIS 1.66 billion, and staffing increasing 37%, from 3,749 to 5,145.[22] Over the same period, passenger numbers and infrastructure each grew 4%, train mileage 7%, and average daily trains 8%; the period also included the COVID-19 pandemic and continuing wars.[22] The company recorded a NIS 56.5 million profit in 2025 against a NIS 24.3 million loss in 2019, but freight losses increased from NIS 33.6 million to NIS 62.6 million while freight revenue remained nearly unchanged, at NIS 326 million and NIS 324 million respectively.[22] The review also identified the absence of an official liquidity safety-buffer policy.[22] Israel Railways and the Transport Workers’ Union challenged aspects of the interpretation, while the company emphasized expanded high-demand services and deployment of ETCS signaling.[22]

Sources

  1. 1Israel Railways Ltd. Annual Report 2025, accessed on November 26, 2026.
  2. 2Institute for National Security Studies, The March of Folly in Israel’s Public Transportation?, accessed on November 26, 2026.
  3. 3Encyclopedia.com, Navon, Joseph, accessed on November 26, 2026.
  4. 4Center for Israel Education, Jaffa-Jerusalem Railway Line Debuts, accessed on November 26, 2026.
  5. 5Jewish Virtual Library, Jerusalem Architectural History: The late Ottoman Period, accessed on November 26, 2026.
  6. 6Central Zionist Archives, The first train in Palestine begins running, accessed on November 26, 2026.
  7. 7University of Haifa Herzl Institute, accessed on November 26, 2026.
  8. 8Ben-Gurion University of the Negev, Palestinian workers of Israel Railways, accessed on November 26, 2026.
  9. 9Library of Congress, Israel, A Country Study, accessed on November 26, 2026.
  10. 10Jewish Virtual Library, Israel's Transportation System, accessed on November 26, 2026.
  11. 11Israel Railways: 2025 Freedom of Information Report, accessed on November 26, 2026.
  12. 12U.S. Department of State, Israel, accessed on November 26, 2026.
  13. 13Jerusalem Institute for Policy Research, Statistical Yearbook, Rail Service, accessed on November 26, 2026.
  14. 14Jewish Virtual Library, Israel Society & Culture: Infrastructure, accessed on November 26, 2026.
  15. 15Jerusalem Institute for Policy Research, A Return Trip to the Train from Jerusalem, accessed on November 26, 2026.
  16. 16Globes, Jerusalem - Tel Aviv fast rail link finally begins operations, accessed on November 26, 2026.
  17. 17Israel Railways Ltd. Annual Report 2024, accessed on November 26, 2026.
  18. 18Israel Railways: Tender 226218, Volume 1, Invitation to Bid, accessed on November 26, 2026.
  19. 19Globes, Israel Railways CEO: We aim for 300m passengers by 2040, accessed on November 26, 2026.
  20. 20Globes, Israel Railways privatization gets moving, accessed on November 26, 2026.
  21. 21Globes, Israel Railways electrification delayed by war and politics, accessed on November 26, 2026.
  22. 22Globes, Gov't Cos Authority: Israel Railways at immediate liquidity risk, accessed on November 26, 2026.

IsraelPedia Question & Answers

  • What is Israel Railways?

    Israel Railways is a government-owned company that operates Israel’s intercity passenger trains and freight services and develops, manages, and maintains the national railway infrastructure. Its passenger business grew from a few million journeys annually to 71.8 million in 2025, when it served 67 passenger stations.

  • When did the first passenger train arrive in Jerusalem?

    The first passenger train from Jaffa arrived in Jerusalem on August 27, 1892, and an official opening ceremony followed in September. The approximately 53-mile route substantially reduced travel time; one account compared a seven-hour camel journey with a three-hour train trip.

  • How did Israel Railways become a separate company?

    Israel Railways began as a unit of the Ministry of Transport and joined the Ports Authority in 1988, which was renamed the Ports and Railways Authority. The company was incorporated in January 1998 and began operating separately from the Ports and Railways Authority in July 2003, following legislative changes and a labor agreement.

  • When did regular electric train service between Jerusalem and Tel Aviv begin?

    Regular electric passenger service on the new Tel Aviv–Jerusalem railway began on September 25, 2018, initially connecting Jerusalem’s Yitzhak Navon station with Ben-Gurion Airport. End-to-end electric service to Tel Aviv’s HaHagana station began in December 2019.

  • How many passengers and freight trains did Israel Railways carry in 2025?

    Israel Railways recorded 71.8 million passenger journeys in 2025, a 10% increase from 65.4 million in 2024. The company operated approximately 49 freight trains daily and moved about 6.6 million tonnes of freight during the year. Passenger totals count journeys, not unique individuals.

  • What does Israel Railways’ 2040 development plan include?

    Israel Railways’ 2040 development plan includes additional and doubled tracks, a target of 125 passenger stations, expanded freight terminals and maintenance compounds, and improved links with ports and other public transport. It proposes lines toward Kiryat Shmona and Eilat and forecasts 300 million annual passenger journeys and approximately 143,000 tonnes of freight per day in 2040. These are targets and projections, not completed infrastructure or current traffic.

  • Why has Israel Railways’ electrification project been delayed?

    Israel Railways’ electrification project has been delayed by work stoppages, war, breakdowns, and disputes over night and Shabbat work. In June 2024, the project was officially delayed to July 2027, with 2030 also raised as a possible completion date. A revised agreement with contractor SEMI added €30 million and reduced night and weekend work.