Coastal Railway Line, Israel

Published

01In brief

The Coastal Railway Line is a rail corridor in Israel running along the Mediterranean coast between Haifa and the Tel Aviv metropolitan area, passing through cities including Hadera and Netanya. A 2022 report called it Israel's most popular railway route and reported an average of 40,000–50,000 daily passengers at stations between Haifa and Tel Aviv. In the fourth quarter of 2018, 3,328,780 passengers used the Tel Aviv–Binyamina section, then identified as Israel Railways' busiest section. Accounts trace the corridor's development through Ottoman, British Mandate, and early Israeli construction phases; in 2013, it was described as the only railway connection between central Israel and the north, carrying both passenger and freight traffic. Plan 65a is intended to add fast tracks designed for 250 km/h and reduce the Haifa–Tel Aviv journey to approximately 30 minutes, with the first construction tender awarded in September 2026.

02Overview and Route

The coastal route links Haifa with central Israel. Under Plan 65a, the expansion segment runs from Hof HaCarmel in southern Haifa to Shefayim and has been reported as roughly 68–70 kilometers long.[4][5] Stations identified for upgrade along the segment include Atlit, Hadera, Netanya, and Netanya Sapir, while Shefayim is planned as a new station at the southern end.[5] Passenger service extends further north from Haifa to Nahariya, and an older transportation account reported 18 trains per day on the Haifa–Nahariya segment and 43 trains per day between the north and Tel Aviv.[6]

As of 2013, the coastal route was described as the only railway link between central Israel and the north, handling both passenger and freight traffic.[3] Israel Railways had at that time anticipated transferring freight to a planned eastern line running along Highway 6, which would free capacity on the coastal corridor.[3] A 2022 closure of the line for one week was used to connect the coastal line with the eastern railway near Hadera, involving the removal of a kilometer of track and the installation of switches, signaling, and communications systems.[1]

03History

The historical origins of the coastal rail corridor span several political eras, and sources attribute different construction phases to different builders. One account dates the original construction to the Ottoman period in 1913, with subsequent expansion by the British during the Mandate period and further development by Israel in the 1950s.[3] A separate account describes the British as having built the coastal railway as part of a line connecting Haifa, the Iraqi oil pipeline, Beirut, and Cairo.[7] These accounts may refer to overlapping or distinct segments of what became the coastal corridor.

During World War I, the British army built an eastern Sharon line — the Lod–Hadera–Haifa route — which made Hadera a rail hub.[8] After the war, a railway from Haifa to Lod was constructed, increasing Haifa's importance as a regional transport hub.[9] The eastern Sharon line later yielded precedence to the coastal Tel Aviv-Yafo–Hadera–Haifa line, which was built in the 1950s.[8]

During the 1948 War of Independence, the existing Mandate-era rail corridor posed a strategic problem: the line ran through territory that had come under Jordanian control. The provisional government began building a new railway southward from Hadera in October 1948, completing the construction within four years and enabling a Haifa–Tel Aviv journey of one and a half hours; ticket prices at the time were set at 550 prutot.[10] Alongside that work, the government undertook railway construction between Haifa and Tel Aviv as part of broader infrastructure development that also extended lines south toward Beersheba, Dimona, and Zin.[11]

During the transition from the British Mandate, the Palestine Railway Company became Israel Railways, a government-owned entity.[12] Most of the Palestine Railways workforce had been Arab, and the new company faced the challenge of operating a rail network that could not immediately be staffed by Jewish workers alone.[12]

In the four decades after Israel's establishment, the country relied primarily on railway infrastructure and equipment inherited from the British, and rail service was characterized as limited — used mainly by young people for tourism rather than as everyday public transport.[13] Between 1965 and 1985, railway use declined further because of service cutbacks.[11] In 1985, the national rail network carried 2,814,000 passengers and 6,086,000 tons of freight, chiefly phosphates, grains, coal, and potash.[11] In 1986, Israel had 528 kilometers of state-owned track linking Jerusalem, Tel Aviv, Haifa, and Beersheba; a 1988 national profile also listed Ashdod.[11] In 1986, road travel was faster than rail on every route in the network except the Haifa–Tel Aviv line, where road and rail travel times were identical.[11]

A broader transportation reform process beginning in 1992 under the Rabin government brought new infrastructure and modern rolling stock. Rail passenger journeys subsequently rose from a few million to more than 70 million annually across the Israeli network.[13] A 2017 tender for 330 new rail cars introduced specifications requiring platforms lowered to the European standard.[14]

04Ridership and Passenger Traffic

The Tel Aviv–Binyamina section, which forms the southern portion of the coastal corridor, was identified as Israel Railways' busiest section in the fourth quarter of 2018, recording 3,328,780 passengers.[2] The Tel Aviv–Haifa section recorded 2,794,270 passengers in the same quarter, presented as a distinct segment.[2]

The COVID-19 pandemic produced a sharp contraction in ridership. The Tel Aviv–Binyamina section carried 2,451,880 passengers in the first quarter of 2020; passenger transport across the national rail network was suspended entirely in April and May 2020. By the fourth quarter of 2020, the same section recorded only 944,760 passengers — 61 percent fewer than in the first quarter of the year.[2]

By 2022, daily passenger volumes at stations between Haifa and Tel Aviv had recovered to an average of 40,000–50,000 per day, and the coastal line was described as Israel's most popular railway route.[1]

05Expansion and Modernization Plans

Plans to dramatically upgrade the coastal corridor have been in development for several years. The core proposal — designated National Infrastructure Plan 65a — covers the approximately 68-kilometer stretch from Hof HaCarmel station in Haifa to Shefayim, adding two fast tracks alongside the existing two and upgrading or building stations along the route.[15][4]

In 2025, the project was formally listed as "Doubling of the Coastal Tracks," managed by Israel Railways Company, with a construction cost estimate of NIS 15,523 million. Its status was listed as "Initiation," while the tender date, construction start, and construction duration were all listed as to be determined.[16] Earlier estimates were lower: a 2021 report put the figure at NIS 12 billion, while a 2025 report gave NIS 15.5 billion.[17][18] By September 2026, the estimated cost was reported at NIS 17 billion.[4] The sources do not reconcile the differences, which may reflect changes in estimate or scope.

The planned fast service would operate at up to 250 km/h between southern Haifa and Shefayim, cutting the Haifa–Tel Aviv journey to approximately 30 minutes, with some trains stopping only at Hadera.[19][5] Suburban trains on the upgraded corridor would travel at up to 160 km/h and cover the route in approximately 50 minutes while stopping at all stations.[5] A 2040 peak-hour projection envisions 14 passenger trains per hour departing Hof HaCarmel station southbound.[5]

A 2025 planning account listed 11 planned stations, including four new ones: Zikhron Ya'akov, Binyamina–Or Akiva, Netanya Colleges, and Shefayim. Existing stations at Hof HaCarmel, Atlit, Hadera, Netanya, and Netanya Sapir would be upgraded.[5] The track through Binyamina would be cancelled and rerouted near Highway 4 between Or Akiva and Binyamina, with a new combined station serving both communities.[5]

Most of the new alignment would follow the existing railway corridor, with deviations around Netanya, Caesarea, Hadera Forest, and the northern part of Sharon Park to accommodate the higher design speeds.[5] The route crosses 13 local authorities and 11 streams, requiring approximately 50 bridges, culverts, and related water-transfer and electrification works.[5] The plan also includes grade-separated railway crossings and measures to improve stream interfaces.[5]

A separate component — Plan 65b — covers the northern segment through Haifa itself, including tunneling, and is being advanced independently.[4] The 2021 planning approval described adding two underground lines within Haifa, stopping at Lev Hamifrats, Kiryat Hamemshala, Bat Galim, and Hof HaCarmel, while the existing surface tracks through those stations would carry fast service from Nahariya to Tel Aviv.[17]

In September 2026, contractor Danya Cebus won the first construction tender for the fast coastal railway, covering the segment between Haifa and Dor. Initial works include a double electrified track, railway bridges, acoustic walls, service roads, drainage, and signaling and communications systems.[4] Reported completion targets have varied across sources, with figures of 2029, 2032, and 2035 cited in different publications at different times.[18][20][4]

06Urban and Coastal Planning Issues

The coastal railway's physical presence has long been a source of tension in Haifa. A 20-kilometer railway corridor through the city — including seven kilometers along the sensitive Mediterranean shoreline — separates parts of the urban fabric from the sea.[21][15] Plans for the Haifa section of the expansion favor underground routing to open coastline, improve pedestrian access between downtown and the water, and free land for housing.[17][22]

In 2010, the National Planning and Building Commission's Coastal Protection Committee barred Israel Railways from placing overhead electrical wires and poles along a stretch of track near the sea, citing severe harm to the coastal view. Israel Railways warned at the time that the ruling could delay the national electrification program and jeopardize electrification of the Akko–Carmiel line.[21]

The 2023 approval of Plan 65a came after seven appeals, most of which focused on potential damage to the coastal environment.[15] Environmental organizations have objected to the plan's potential coastal impacts, and the separate Haifa intra-city section remained unapproved and contested as of 2023.[15] Haifa Mayor Einat Kalisch-Rotem described the planned underground lines as "a real revolution for a city that is desperate to connect with its beach."[17]

Sources

  1. 1Globes, Coastal line railway stations closed for renovations. What happened on the roads?, accessed on October 14, 2026.
  2. 2Jerusalem Institute for Policy Research, A Return Trip to the Train from Jerusalem, accessed on October 14, 2026.
  3. 3Globes, Israel Railways mulls additional tracks on coast route, accessed on October 14, 2026.
  4. 4Calcalist, From Haifa to Tel Aviv in half an hour: Work on the fast railway gets underway, accessed on October 14, 2026.
  5. 5Ynet, From Haifa to the center in half an hour: This is how the coastal railway route is expected to look in 2040, accessed on October 14, 2026.
  6. 6Jewish Virtual Library, Israel Science & Technology: Transportation Industry, accessed on October 14, 2026.
  7. 7Ynet, The fire railway, accessed on October 14, 2026.
  8. 8Encyclopaedia Britannica, Hadera, accessed on October 14, 2026.
  9. 9National Library of Israel, Haifa, accessed on October 14, 2026.
  10. 10Mako, The dispute stalling the railway due to conflicts between the Ministry of Transport and Haifa Municipality, accessed on October 14, 2026.
  11. 11Library of Congress, Israel: A Country Study, accessed on October 14, 2026.
  12. 12Ben-Gurion University of the Negev, Palestinian workers of Israel Railways, accessed on October 14, 2026.
  13. 13Institute for National Security Studies, The March of Folly in Israel’s Public Transportation?, accessed on October 14, 2026.
  14. 14Institute for National Security Studies, China and National Infrastructure in Israel: Past the Peak, accessed on October 14, 2026.
  15. 15Globes, Appeals C'ttee approves fast Tel Aviv-Haifa rail link, accessed on October 14, 2026.
  16. 16Government of Israel, Infrastructure for Growth 2025, accessed on October 14, 2026.
  17. 17The Times of Israel, High-Speed Rail Approval, accessed on October 14, 2026.
  18. 18The Jerusalem Post, Future Tel Aviv-Haifa train to cut travel time by 30 min., accessed on October 14, 2026.
  19. 19Israel Hayom, Israel to get its own bullet train, accessed on October 14, 2026.
  20. 20Ynetnews, Transportation revolution: High-speed rail and metro promise faster travel with major disruptions ahead, accessed on October 14, 2026.
  21. 21Globes, Haifa mayor, environmentalists win train battle, accessed on October 14, 2026.
  22. 22The Times of Israel, Haifa Bay Urban Plan, accessed on October 14, 2026.

IsraelPedia Question & Answers

  • What is the Coastal Railway Line in Israel?

    The Coastal Railway Line is a rail corridor in Israel running along the Mediterranean coast between Haifa and the Tel Aviv metropolitan area, passing through cities including Hadera and Netanya. As of 2013, it was described as the only railway connection between central Israel and the north, carrying both passenger and freight traffic. A 2022 report called it Israel's most popular railway route, with an average of 40,000–50,000 daily passengers at stations between Haifa and Tel Aviv.

  • What are the historical origins of the Coastal Railway Line?

    The coastal rail corridor's origins span several political eras. One account dates the original construction to the Ottoman period in 1913, with subsequent expansion by the British during the Mandate period and further development by Israel in the 1950s. During the 1948 War of Independence, the existing Mandate-era corridor ran through territory that had come under Jordanian control, prompting the provisional government to begin building a new railway southward from Hadera in October 1948, completing it within four years.

  • How did ridership on the Coastal Railway Line change during the COVID-19 pandemic?

    The COVID-19 pandemic caused a sharp contraction in ridership on the coastal corridor. The Tel Aviv–Binyamina section carried 2,451,880 passengers in the first quarter of 2020, but passenger transport across the national rail network was suspended entirely in April and May 2020. By the fourth quarter of 2020, the same section recorded only 944,760 passengers — 61 percent fewer than in the first quarter of the year. By 2022, daily passenger volumes between Haifa and Tel Aviv had recovered to an average of 40,000–50,000 per day.

  • What is Plan 65a for the Coastal Railway Line?

    Plan 65a, formally designated "Doubling of the Coastal Tracks," is a major expansion project covering approximately 68 kilometers from Hof HaCarmel station in Haifa to Shefayim. The plan adds two fast tracks alongside the existing two and upgrades or builds stations along the route. Fast trains would operate at up to 250 km/h, cutting the Haifa–Tel Aviv journey to approximately 30 minutes. In 2025, the construction cost was estimated at NIS 15,523 million, though a September 2026 report put the figure at NIS 17 billion.

  • What coastal and environmental concerns surround the Coastal Railway Line expansion?

    The coastal railway's physical presence has long been a source of tension, particularly in Haifa, where a 20-kilometer railway corridor — including seven kilometers along the Mediterranean shoreline — separates parts of the urban fabric from the sea. In 2010, the National Planning and Building Commission's Coastal Protection Committee barred Israel Railways from placing overhead electrical wires and poles along a stretch of track near the sea, citing severe harm to the coastal view. The 2023 approval of Plan 65a came after seven appeals, most of which focused on potential damage to the coastal environment.

  • Who won the first construction tender for the fast coastal railway, and what does it cover?

    In September 2026, contractor Danya Cebus won the first construction tender for the fast coastal railway, covering the segment between Haifa and Dor. Initial works include a double electrified track, railway bridges, acoustic walls, service roads, drainage, and signaling and communications systems. Reported completion targets have varied across sources, with figures of 2029, 2032, and 2035 cited in different publications at different times.