Solel Boneh

Published

01In brief

Solel Boneh is an Israeli construction and civil-engineering company that forms part of the Shikun & Binui group and originated in the Histadrut’s public-works enterprises. During World War II, it executed military orders valued at £P 9 million, building infrastructure across the Middle East for the British war effort. Its history connects immigrant employment and training, Jewish settlement and defense, the construction of Israel’s public institutions, and the expansion of Israeli contracting overseas. Its projects have ranged from housing, hospitals, and power stations to national highways, ports, and underground rail infrastructure.

02Overview

Solel Boneh serves as Shikun & Binui’s civil-engineering and construction arm in Israel and is the group’s oldest company.[1] Its activities encompass complex buildings, transport infrastructure, underground works, concrete production, and specialized engineering services.[5][6] Historically, it combined commercial contracting with the Histadrut’s objectives of providing employment, developing workers’ skills, and building the infrastructure of the Jewish community in the Land of Israel.[4]

The enterprise belonged to an extensive labor-movement economic network rather than developing solely as an independent private contractor.[7] The Histadrut established Hevrat HaOvdim to finance and manage large enterprises, including Solel Boneh, Tenuvah, and Bank HaPoalim.[7] Within this framework, Solel Boneh undertook roads, housing, public buildings, and industrial construction while providing employment and building-skills training, particularly for new immigrants.[4]

Its development included financial collapse in the 1920s, revival in the 1930s, major wartime expansion, and a further financial crisis in the 1980s.[3][4] Alongside its domestic construction business, overseas operations extended Israeli engineering activity into Africa, Asia, and non-Arab countries of the Middle East.[3] Manufacturing interests that developed within Solel Boneh also contributed to the emergence of the Koor industrial group.[4]

03Origins and History

Organized groups of Third Aliyah pioneers undertaking road building and quarrying formed the foundations of Solel Boneh.[3] In 1920, the Agricultural Workers’ Union reached an agreement with the Mandatory government’s Public Works Department to construct the road between Tiberias and Zemah.[3] Separate labor-party contracting offices merged in 1921 into the Histadrut’s Public Works and Building Office, which adopted the name Solel Boneh in 1924.[3] The enterprise’s institutional origins are also dated to October 17, 1920, when its initial activities were described as construction and public works for immigrants and the British administration.[8]

Initially a semi-independent road-laying agency, the organization expanded into public construction and undertook projects that private entrepreneurs or the British government might not otherwise have pursued.[9] Within two years, it handled more than £1 million in contracts from private investors, the Zionist Executive, and the Mandatory government.[9] Early activities included swamp drainage in the Jezreel and Chula valleys, road construction, housing, and office buildings, opening thousands of employment opportunities.[9]

Housing construction in Jerusalem’s Beit Hakerem neighborhood was an early project of the Palestine Office for Public Works, Solel Boneh’s predecessor.[10] Architect Richard Kaufmann planned the neighborhood, where construction began in 1922; within two years, 29 houses were inhabited, and 67 had been built by 1927.[10] Elsewhere, the enterprise contributed to the growth of Tel Aviv and Jewish quarters in Jerusalem and Haifa, worked on British army camps, and helped lay railway lines.[3] Early projects also included the Naharayim power plant, main roads, and the first Hebrew University building in Jerusalem.[11]

The building boom associated with the Fourth Aliyah from 1924 strengthened Solel Boneh’s position among contractors, suppliers, and banks.[4] Its work extended beyond buildings to factories, roads, railways, bridges, and drainage works.[12] During its first period of operation, contracts totaled approximately £1.5 million, with managers elected by the workers overseeing their execution.[12] Employment sometimes reached between 2,000 and 3,000 workers.[12]

Expansion nevertheless exceeded the enterprise’s limited financial resources, and it went bankrupt in 1927.[3] Contributing pressures included insufficient operating capital, the collapse of the building boom, prolonged negotiations over a special loan, restrictions on accepting further contracts, and excessive centralization that weakened contact with workers.[12] Its difficulties also affected Hamashbir, which had supplied credit in kind.[13] A Histadrut-controlled Public Works Center replaced Solel Boneh, while local labor councils established their own contracting offices.[13]

Solel Boneh resumed activity in 1935 as a joint-stock company owned by the Workers’ Society.[1] Between 1937 and 1945, it absorbed local contracting offices, rebuilding a centralized contracting enterprise.[13] It weathered the late-1930s downturn and subsequently expanded through work associated with the wartime economy.[13]

During the 1936–1939 Arab Revolt, Solel Boneh built stockade-and-watchtower settlements, fortifications in Jewish areas, police stations in outlying locations, and security roads.[3][14] Its participation in the Tower and Stockade campaign included construction of 52 fortified Jewish agricultural settlements.[11] It also organized Jewish labor for work at the Tel Aviv and Haifa ports.[14] Employees participated in the Jewish community’s security activities, including border defenses and intelligence links between Jewish national institutions and British intelligence organizations.[15] The enterprise’s pre-state activities also included assistance to clandestine immigration.[1]

According to the National Library of Israel, the British awarded Solel Boneh the franchise to build the northern border fence in 1938. The fence was intended to prevent personnel and weapons from reaching Arab forces during the revolt.[16] To meet a three-month target, the company hired approximately 1,000 workers, including about 300 guards protecting the worksite and camp.[16] The library describes the route as running from the Yarmuk to the Kinneret, onward to Hula Lake, and westward to Ras-El-Nakura, or Rosh Hanikra.[16] Four meters wide, the fence consisted of four rows of metal bars with barbed wire between them, while the workers’ tent camp moved as construction advanced.[16]

The National Library reports that local Arabs attempted to halt construction, damaged sections of the fence, and killed two workers.[16] Despite sabotage and harassment, the work finished on schedule, with a celebration at the Betzet camp in July 1938.[16] The library says the British subsequently added five Tegart fortresses and twenty pillboxes, completing the full system in early 1939 before dismantling the fence in the mid-1940s.[16] It characterizes the undertaking as one of the largest infrastructure projects carried out by the Jewish settlement up to that time, combining large-scale employment, organization, and security arrangements.[16]

World War II brought substantial regional expansion through British military contracts.[3] Solel Boneh built army camps locally and airfields, bridges, roads, and factories in Egypt, Syria, Iraq, Cyprus, Iran, and Bahrain.[3] Its wartime military orders amounted to £P 9 million and included enlarging the Haifa and Abadan oil refineries, constructing a military bridge across the Euphrates, and building an aerodrome in Bahrain.[2] Other work encompassed fortifications, hospitals, repair shops, generator stations, military camps, and roads.[2]

Major British military projects from 1941 onward helped make Solel Boneh the leading contractor in Palestine and its vicinity.[4] In the early 1940s, it also entered manufacturing, acquiring the Nesher cement enterprise, the Finizia glass producer, and the Vulcan iron-casting firm in the Haifa Bay area.[4] Its industrial expansion also encompassed Hamat metal factories, and its manufacturing interests led to the creation of Koor.[1][4]

During the War of Independence, Solel Boneh built fortifications and defense lines, installed water pipes, and transported essential commodities and supplies.[14] After statehood, it constructed thousands of immigrant homes, schools, hospitals, factories, roads, and airports.[14] Housing work included contracts for the government and the Histadrut housing companies Shikun and Neveh Oved, which merged in the 1950s to form Shikun Ovdim.[1]

A 1958 reorganization initiated by Pinhas Lavon divided the enterprise into Building and Public Works, Overseas and Harbors Works, and Industry.[3] Associated subsidiaries included Even va-Sid for building materials, Herouth for sanitary installations, and Hemar for tiles and cement products.[3] Workers’ representatives joined company managements: three of ten members in Building and Public Works, the same proportion in Even va-Sid, and two of eleven in Herouth.[3] Solel Boneh was listed on the Tel Aviv Stock Exchange in 1961.[17]

By 1969, Building and Public Works had turnover of IL 462 million and more than 22,000 employees; Overseas and Harbors Works recorded IL 138 million, while Koor recorded IL 700 million and employed 12,000 factory workers.[13] At the end of 1970, Solel Boneh employed approximately 25,000 workers and had turnover of about $230 million.[3] It remained dominant in Israeli building until another collapse in the mid-1980s.[4]

A 1988 restructuring approved by Hevrat HaOvdim provided for Solel Boneh’s sale to Shikun Ovdim for $100 million.[18] Of that sum, $25 million was designated as working capital and the remainder for repayment of bank debts.[18] Control passed to the Shikun u’Binui conglomerate in 1989.[17] The wider group’s privatization included the sale of shares to employees in 1996, with Ted Arison providing guarantees in exchange for a 15 percent shareholding and rights to acquire additional shares.[11]

After delisting in 1987 because of financial difficulties, Solel Boneh returned to public trading in 1997 following a decade-long recovery led by chairman Uzi Verdizer and general manager Shaul Amit, at a reported valuation of NIS 470 million.[19] Its 1996 revenue was NIS 1.8 billion, and its project backlog approached NIS 2 billion at the end of March 1997.[19] Construction accounted for 64–67 percent of revenue, roads and infrastructure for 17–19.5 percent, industrial operations for 14 percent, and transportation services for 2.4 percent.[19] By the early 2000s, turnover exceeded $400 million.[3]

04Practice and Application

The Knesset building was constructed from 1958 to 1966 after Solel Boneh and its subsidiary Even Sid won the construction bid.[11] The government had decided on a permanent parliament building in 1955, and Joseph Klarwein won the architectural competition in 1957; the completed structure involved several architects, including Dov Karmi and Ram Karmi.[11] Construction required an on-site concrete facility, large cranes moving along wide rails, and hundreds of workers.[11]

Other major projects included the National Water Carrier and the port of Ashdod.[15] The company also built the atomic research center at Nahal Sorek, the Hadassah–Hebrew University Medical Center at Ein Kerem, and the Haifa power station’s 268-foot chimney.[3] Its public and national construction portfolio also included the Israel Museum, university campuses, the Dimona reactor, hospitals, courts, and cultural institutions.[15] Its completed landmarks include Jerusalem’s government compound, International Convention Center, Yad Vashem, Soroka Hospital, the King David Hotel, the Ministry of Defense offices in the Kirya, and the Haifa Court of Justice Hall.[1]

Energy and urban projects included the Naharayim, Reading, and Hadera power stations, while port works extended to both Haifa and Ashdod.[1] Tel Aviv’s Cultural Hall and Shalom Tower also formed part of its construction record.[20] By 1997, major individual projects included the eight-bridge Kessem interchange on the Cross-Israel Highway, Eilat’s Club Hotel, and the Hyatt Hotel at the Dead Sea, each valued at more than NIS 100 million.[19]

Road 6, or the Cross-Israel Highway, was constructed as a build-operate-transfer project.[21] Its main section was built between 2000 and 2004, with Section 18 following between 2006 and 2009.[21] Central sections opened in 2002 and 2004, and Section 18 was completed in July 2009.[11] The project covered 140 kilometers, 13 interchanges, and 150 bridges, with eventual expansion expected to reach 247 kilometers.[21] Solel Boneh’s involvement in the highway was part of a project valued at $1.3 billion.[3]

In 2011, the company won a NIS 55 million design-and-build tender for the Jaljulya interchange on Road 531, defeating twenty competing companies.[22] The contract specified a 21-month construction period.[22] In 2015, Solel Boneh and China Railway Tunnel Group won a NIS 2.9 billion contract for the western underground section of Tel Aviv’s Red Line light rail.[23] That contract covered two parallel five-kilometer tunnels and six underground stations.[23]

International construction developed through Overseas and Harbors Works, which operated in Africa, Asia, and non-Arab countries of the Middle East.[3] During the period of cordial Israeli-Iranian relations from the 1950s through the late 1970s, Solel Boneh worked on Iranian hotels, including the Tehran Hilton, a housing community for American military personnel in Isfahan, and hundreds of other residential units.[24]

In early-1980s Sri Lanka, a large share of the Mahaweli development contract went to the company under the spelling “Solel Bonah.”[25] The wider project addressed an energy crisis and provided for the settlement of Sinhalese farmers in dry-zone areas.[25] Two Israeli academics helped make the case for a $250 million World Bank investment, while Israeli architect Ulrik Plesner planned six new towns for the settlements.[25]

In 2006, Solel Boneh International won a Nigerian road-construction bid reportedly worth $270 million, bringing the value of overseas contracts won since the beginning of that year to $700 million.[26] Earlier contracts totaling $220 million included a $100 million World Bank-funded road reconstruction in Kenya, a $60 million European Union-funded road project in eastern Uganda, and a $60 million Nigerian government-funded National Library building in Abuja.[26] The overseas arm, SBI, also built roads, power plants, and other projects in Africa, Latin America, and elsewhere.[27]

The company’s engineering services encompass roads, railway infrastructure, airport runways, interchanges, bridges, tunnels, pipe-rammed underground installations, and asphalt works.[5] Specialized equipment includes laser paving devices, and its infrastructure division participates in the Gush Dan Light Rail project.[5] Its building activities cover public and residential construction, including public-private partnerships that may combine financing, planning, construction, service, maintenance, and operation.[6]

Specialist operations include Cementcal, established in 1967 as the geotechnical-work arm, which undertakes ground anchoring, groundwater lowering, jet grouting, and concrete works.[5] Solel Boneh also operates a major precast-concrete plant and ten concrete plants and shipping facilities nationwide, producing approximately one million cubic meters of concrete annually.[5] Its broader services include precast construction, logistics, underground engineering, and build-operate-transfer projects.[6]

Digital construction initiatives include Building Information Modeling, drones for monitoring sites, and digital imaging to identify risks and violations.[28] In 2018, Solel Boneh entered a cooperation agreement with the Haifa startup IntSite to develop autonomous construction cranes.[29] The system incorporated Internet of Things devices, machine learning, computer vision, and natural-language-processing technologies, with the stated objectives of improving productivity and safety while lowering costs.[29] The collaboration also formed part of the company’s use of artificial intelligence and electronic vision in construction equipment.[28]

In October 2024, Solel Boneh won the tender to design and build a replacement police station in Sderot.[20] The planned building comprised two stories and a basement, with construction expected to take approximately twelve months after municipal approval of a new zoning plan.[20] Its contemporary design-build work also extended to private, public, and security projects, including the relocation of IDF facilities to the Negev.[20] Residential projects, railway works, power stations, and public buildings remained part of its portfolio in 2025, alongside an emphasis on sustainability, green construction, and engineering innovation.[30]

05Significance

Solel Boneh’s construction of immigrant housing and provision of employment and vocational training connected infrastructure development with the integration of new arrivals into the Jewish community.[4] Hundreds of immigrants were drawn to its early projects, where established workers helped them acquire skills and enter employment.[11] Its post-state housing programs extended that role through large-scale work for the government and labor-movement housing companies.[1]

Its history also illustrates the labor movement’s combination of economic institution-building and public works.[7] Early worker-elected management and the later inclusion of worker representatives in company managements gave organizational expression to that connection.[12][3] Through its industrial acquisitions and the creation of Koor, its influence extended beyond contracting into building materials and manufacturing.[4] Koor subsequently dominated Israeli manufacturing for four decades after independence, while Solel Boneh occupied a similarly prominent position in building until the mid-1980s.[4]

The northern fence, Tower and Stockade settlements, wartime military installations, and War of Independence supply and engineering work demonstrate the recurring connection between its construction capabilities and Jewish communal security.[16][14] Its later portfolio placed it behind parliamentary, medical, educational, cultural, energy, and transport institutions central to Israel’s development.[1][15] Overseas contracts carried those engineering capabilities into projects across several continents.[3]

A substantial photographic archive preserves the company’s construction history.[31] Photographer Ami Arav worked for Solel Boneh from 1956 to 1986, documenting projects in Israel and abroad.[31] The company acquired 60,000 negatives and photographs from his family for its historical archive.[31] In the 1960s, the company’s workforce numbered approximately 30,000 employees, reflecting the scale of the organization whose work the collection documents.[31]

06Controversies

Guatemalan prosecutors suspected several officials of SBI, Solel Boneh’s overseas arm and a Shikun & Binui subsidiary, of paying $6.1 million in bribes to former infrastructure minister Alejandro Sinibaldi between 2012 and 2015 to obtain contracts.[27] These were reported suspicions rather than established findings in the cited report.[27]

The company’s original institutional setting also combined the Histadrut’s role as an employer owning productive enterprises with its role as a trade union representing employees.[32] This dual responsibility created a conflict of interest within the labor movement’s economic and political leadership.[32]

Sources

  1. 1Shikun & Binui, Solel Boneh, accessed on November 4, 2026.
  2. 2Center for Israel Education, Reports of the Jewish Agency Executives, accessed on November 4, 2026.
  3. 3Encyclopedia.com, Solel Boneh, accessed on November 4, 2026.
  4. 4Encyclopedia.com, Land of Israel: Economic Affairs, accessed on November 4, 2026.
  5. 5Shikun & Binui, Divisions and Companies, accessed on November 4, 2026.
  6. 6Shikun & Binui, Services, accessed on November 4, 2026.
  7. 7Library of Congress, Israel: A Country Study, accessed on November 4, 2026.
  8. 8Center for Israel Education, Solel Boneh is Established to Develop Housing and Infrastructure for the Growing Yishuv, accessed on November 4, 2026.
  9. 9Internet Archive, Full text of "History Of Israel - From The Rise Of Zionism To Our Time / A Howard M Sachar (1977)", accessed on November 4, 2026.
  10. 10The Jerusalem Post, A town within the city, accessed on November 4, 2026.
  11. 11Shikun & Binui, History, accessed on November 4, 2026.
  12. 12Hebrew Union College, Alexander P. Feinsilver, The Jewish Labor Movement in Palestine, 1937, accessed on November 4, 2026.
  13. 13Encyclopedia.com, Land of Israel: Labor, accessed on November 4, 2026.
  14. 14Jewish Virtual Library, Pre-State Israel: Solel Boneh, accessed on November 4, 2026.
  15. 15Ynet, Saluting the Builders and Road Builders of the Land, accessed on November 4, 2026.
  16. 16National Library of Israel, Northern Border Fence, accessed on November 4, 2026.
  17. 17Globes, 10 Things About Solel Boneh, accessed on November 4, 2026.
  18. 18Internet Archive, Full text of "The Jerusalem Post Magazine , 1988, Israel, English", accessed on November 4, 2026.
  19. 19Globes, Solel Boneh�s Big Comeback, accessed on November 4, 2026.
  20. 20The Jerusalem Post, Solel Boneh to restore another historic building in Sderot, accessed on November 4, 2026.
  21. 21Shikun & Binui, ROAD 6 (CROSS ISRAEL HIGHWAY), accessed on November 4, 2026.
  22. 22Globes, Solel Boneh wins first Kfar Saba-Herzliya road tender, accessed on November 4, 2026.
  23. 23Globes, Arison, Chinese co win TA light rail underground tender, accessed on November 4, 2026.
  24. 24Ynetnews, From friends to foes: how Israel and Iran were once close allies, accessed on November 4, 2026.
  25. 25Begin-Sadat Center for Strategic Studies, The Israeli-Sri Lankan Relationship, accessed on November 4, 2026.
  26. 26Ynetnews, Israeli company wins Nigeria construction bid, accessed on November 4, 2026.
  27. 27The Times of Israel, Guatemala Bribery Suspicions, accessed on November 4, 2026.
  28. 28Shikun & Binui, Innovation, accessed on November 4, 2026.
  29. 29The Times of Israel, Autonomous Construction Cranes, accessed on November 4, 2026.
  30. 30Maariv, Rare Photos Revealed: The Early Days of the Brands That Built Israel, accessed on November 4, 2026.
  31. 31Maariv, The Company That Built the State: A Special Photo Archive of “Solel Boneh” Revealed, accessed on November 4, 2026.
  32. 32Begin-Sadat Center for Strategic Studies, Wanted: A Mapainik Leadership, accessed on November 4, 2026.

IsraelPedia Question & Answers

  • What is Solel Boneh?

    Solel Boneh is an Israeli construction and civil-engineering company that forms part of the Shikun & Binui group and originated in the Histadrut’s public-works enterprises. Its work has included housing, hospitals, power stations, highways, ports, and underground rail infrastructure. The company has also provided employment and training, built infrastructure for the Jewish community, and expanded its contracting operations overseas.

  • How did Solel Boneh begin, and what happened to it in 1927?

    Solel Boneh grew from Third Aliyah pioneer groups that undertook road building and quarrying. Separate labor-party contracting offices merged in 1921 into the Histadrut’s Public Works and Building Office, which adopted the name Solel Boneh in 1924. After rapid expansion strained its limited financial resources, the enterprise went bankrupt in 1927; it resumed activity in 1935 as a joint-stock company owned by the Workers’ Society.

  • What did Solel Boneh build for the British during World War II?

    During World War II, Solel Boneh carried out British military contracts worth £P 9 million. It built army camps, airfields, bridges, roads, factories, hospitals, fortifications, repair shops, and generator stations in the region. Major projects included enlarging the Haifa and Abadan oil refineries, constructing a military bridge across the Euphrates, and building an aerodrome in Bahrain.

  • What role did Solel Boneh play in building Israel after independence?

    After statehood, Solel Boneh built thousands of homes for immigrants, along with schools, hospitals, factories, roads, and airports. Its projects also included major public and national institutions such as the Knesset building, the National Water Carrier, the port of Ashdod, hospitals, universities, and power stations. The company’s housing work included contracts for the government and the Histadrut housing companies Shikun and Neveh Oved.

  • What caused Solel Boneh’s financial crisis in the 1980s, and who took control?

    Solel Boneh faced another collapse in the mid-1980s and was delisted in 1987 because of financial difficulties. A 1988 restructuring approved its sale to Shikun Ovdim for $100 million, with $25 million designated as working capital and the remainder for bank-debt repayment. Control passed to the Shikun u’Binui conglomerate in 1989, and Solel Boneh returned to public trading in 1997 after a decade-long recovery.

  • What major transport projects has Solel Boneh worked on?

    Solel Boneh worked on Road 6, the Cross-Israel Highway, whose main section was built between 2000 and 2004 and whose Section 18 was completed in July 2009. The project covered 140 kilometers, 13 interchanges, and 150 bridges, and the company’s involvement was part of a project valued at $1.3 billion. In 2015, Solel Boneh and China Railway Tunnel Group won a NIS 2.9 billion contract for two parallel five-kilometer tunnels and six underground stations on the western section of Tel Aviv’s Red Line light rail.

  • What were the reported bribery suspicions involving Solel Boneh’s overseas arm?

    Guatemalan prosecutors suspected officials of SBI, Solel Boneh’s overseas arm and a Shikun & Binui subsidiary, of paying $6.1 million in bribes to former infrastructure minister Alejandro Sinibaldi between 2012 and 2015 to obtain contracts. The reported account described these as suspicions, not established findings.