← All articles

Total current articles · 2,133

Rosh HaAyin–North Railway Station

Published

01In brief

Rosh HaAyin–North is a railway station in central Israel serving Rosh HaAyin, Kafr Qasem, and nearby employment areas. Built in 2003 as part of the Tel Aviv–Hod HaSharon line, the station was significantly upgraded in 2026 for the Eastern Railway's first operating phase. It became the line's interim southern terminus and a transfer point connecting newly served communities in the Sharon region with trains toward Tel Aviv and the wider national network.

02Overview and Access

The station is at the northeastern edge of the Rosh HaAyin area, between three and ten kilometers from residential and industrial zones in Rosh HaAyin and Kafr Qasem.[1] A 2017 report described it as serving both communities and workers in nearby employment and industrial areas. At that time, the report cited approximately 42,000 residents in established Rosh HaAyin, another 72,000 expected in new neighborhoods, and 23,000 registered residents in Kafr Qasem; these are historical figures rather than current population counts.[1]

Major highways and the Qesem Interchange create physical barriers between the station and surrounding neighborhoods. According to the conditions documented in 2017, reaching the station from nearby areas could take as long as 40 minutes despite the relatively short distances involved.[1]

Bus services connect the station to local communities, but they are subject to the same road congestion as private vehicles.[1] In 2017, while an additional parking lot was being prepared, Rosh HaAyin's mayor was asked how roughly 500 more cars arriving to park free would affect congestion. He replied: "Good question."[1]

In 2019, Israel Railways reported that 500 parking spaces had recently been added near the station, bringing the total to approximately 1,150 free spaces at that time.[2]

03History

Rosh HaAyin–North station was built in 2003 alongside the railway line connecting Tel Aviv to Hod HaSharon.[1] Its construction coincided with the cancellation of a planned Rosh HaAyin South station; Israel Railways said the southern station had been dropped because it would have significantly lengthened the route.[1]

In the route described by Ynet in 2003, trains from Kfar Saba were to pass through Rosh HaAyin–North, continue through the Segula junction in Petah Tikva and Bnei Brak, and terminate near Tel Aviv University.[3] This placed Rosh HaAyin–North as an intermediate station on the Kfar Saba–Tel Aviv corridor.

04Eastern Railway Upgrade and Expansion

Rosh HaAyin–North was incorporated into Israel Railways' Eastern Railway project and significantly upgraded as part of it.[4] The project was described as an approximately 65-kilometer route near Highway 6 with six stations, five of them newly constructed.[4] When the full route is completed, it is planned to continue past Ben-Gurion Airport to Lod, where it will rejoin the existing national network.[5]

The initial section of the Eastern Railway began partial operations on June 28, 2026, running from the coastal railway north of Hadera south to Rosh HaAyin.[5] During this phase, Rosh HaAyin–North serves as the interim southern terminus and transfer point. Passengers from Hadera East, Shomron–Tayyiba, and Kokhav Yair–Tira travel to Rosh HaAyin–North and transfer to existing services toward Tel Aviv and other destinations, with an approximately seven-minute connection.[5][6]

Reported journey times to Rosh HaAyin–North were 32 minutes from Hadera East, 18 minutes from Shomron–Tayyiba, and 11 minutes from Kokhav Yair–Tira. The reported journeys onward to Tel Aviv took approximately 60, 46, and 39 minutes respectively, including the transfer.[6]

At launch, the service operated two trains per hour in each direction, Sunday through Thursday, from approximately 6:00 a.m. to 9:00 p.m. Diesel trains were initially used while electrification work continued.[5][6] Service was expected to expand with the completion of the full route to Lod, including the addition of Shoham–Aviation and Elad stations.[5][6]

05Current Services and Frequency

Rosh HaAyin–North is served by trains on the Ra'anana–Ashdod line and by the Eastern Railway service to Hadera East.[7][8] An Israel Railways frequency announcement said that peak service on the Ra'anana–Ashdod line would increase to three or four trains per hour, including service at Rosh HaAyin–North.[7]

For Yom Kippur service in September 2026, trains were scheduled to operate until 1:00 p.m. on Sunday, September 20, with increased service on the Hadera East–Rosh HaAyin–North line, and to resume on Tuesday, September 22.[8]

06Role in the Eastern Railway Project

The Eastern Railway project is expected to increase Israel's national rail-network capacity by approximately 30% and includes 47 new bridges.[4] By serving as the interim southern terminus and transfer hub during the first operating phase, Rosh HaAyin–North extends rail access to communities in the central Sharon region, including Arab communities such as Tayibe and Tira that previously lacked direct train service.[5][6]

Sources

  1. 1Globes, There was a big traffic jam – and there will be a huge one: the great missed opportunity of the construction bonanza in Rosh HaAyin, accessed on September 26, 2026.
  2. 2Ynet, More trouble for train passengers: the parking lot adjacent to the station in Petah Tikva will close, accessed on September 26, 2026.
  3. 3Ynet, The Kfar Saba–Tel Aviv train sets off, accessed on September 26, 2026.
  4. 4Jewish News Syndicate, Netanyahu inaugurates Israel Railways’ Eastern Railway, accessed on September 26, 2026.
  5. 5The Jerusalem Post, Israel Railways partially opens Eastern Line, inaugurates three new stations, accessed on September 26, 2026.
  6. 6Ynet, The Eastern Railway opens, for the first time stations in Arab cities, accessed on September 26, 2026.
  7. 7Ynetnews, Starting today: Train frequency to increase on Raanana-Ashdod line, accessed on September 26, 2026.
  8. 8Ynetnews, Train Service to Be Enhanced on Yom Kippur Eve, Operating Until 1 p.m.; Will Resume Tuesday, accessed on September 26, 2026.

IsraelPedia Question & Answers

  • What is Rosh HaAyin–North Railway Station?

    Rosh HaAyin–North is a railway station in central Israel serving Rosh HaAyin, Kafr Qasem, and nearby employment areas. Built in 2003 as part of the Tel Aviv–Hod HaSharon line, it was significantly upgraded in 2026 for the Eastern Railway's first operating phase, becoming that line's interim southern terminus and a transfer point connecting newly served communities in the Sharon region with trains toward Tel Aviv and the wider national network.

  • Why is Rosh HaAyin–North station difficult to reach from nearby neighborhoods?

    Major highways and the Qesem Interchange create physical barriers between Rosh HaAyin–North station and the surrounding neighborhoods. According to conditions documented in 2017, reaching the station from nearby areas could take as long as 40 minutes despite the relatively short distances involved. Bus services connect the station to local communities but are subject to the same road congestion as private vehicles.

  • When was Rosh HaAyin–North station built, and what happened to the planned Rosh HaAyin South station?

    Rosh HaAyin–North station was built in 2003 alongside the railway line connecting Tel Aviv to Hod HaSharon. Its construction coincided with the cancellation of a planned Rosh HaAyin South station; Israel Railways said the southern station had been dropped because it would have significantly lengthened the route.

  • When did the Eastern Railway begin service at Rosh HaAyin–North, and how does it operate?

    The Eastern Railway began partial operations on June 28, 2026, running from the coastal railway north of Hadera south to Rosh HaAyin–North. During this initial phase, passengers from Hadera East, Shomron–Tayyiba, and Kokhav Yair–Tira travel to Rosh HaAyin–North and transfer to existing services toward Tel Aviv, with an approximately seven-minute connection. At launch, the service operated two trains per hour in each direction, Sunday through Thursday, from approximately 6:00 a.m. to 9:00 p.m., using diesel trains while electrification work continued.

  • What is the full scope of the Eastern Railway project that Rosh HaAyin–North is part of?

    The Eastern Railway is an approximately 65-kilometer route near Highway 6 with six stations, five of them newly constructed. When completed, the route is planned to continue past Ben-Gurion Airport to Lod, where it will rejoin the existing national network. The project is expected to increase Israel's national rail-network capacity by approximately 30% and includes 47 new bridges.

  • Which communities gained their first direct train service through Rosh HaAyin–North's role in the Eastern Railway?

    By serving as the interim southern terminus and transfer hub during the Eastern Railway's first operating phase, Rosh HaAyin–North extended rail access to communities in the central Sharon region, including the Arab communities of Tayibe and Tira, which previously lacked direct train service.