← All articles

Total current articles · 425

Highway 9 (Israel)

Published

01In brief

Highway 9 (also designated Route 9) is a road designation shared by two geographically distinct roads in Israel: a Jerusalem entrance road running through Emek ha-Arazim, and a newer northern expressway connecting the Hadera area with the Hefer Valley. The Jerusalem segment, approximately two kilometers long, was built to reduce traffic congestion at the western entrance to the city and opened to traffic at the end of 2007. The northern route, which links Route 4 with Route 6 in the Hadera region, opened in stages between 2014 and 2016.

02Jerusalem Segment: Overview and Purpose

The Jerusalem segment of Highway 9 was established by the Jerusalem Municipality through the Moriah Jerusalem Development Corporation.[1] Its primary purpose was to reduce traffic congestion at the entrance to Jerusalem and provide a fast entry and exit route for the city's northern neighborhoods.[1] The road runs through Emek ha-Arazim, linking the Motza junction with the Ramot junction and connecting with Begin Boulevard at the foot of Har Hotzvim.[2]

Plans reported in 2008 treated Highway 9 as the northern section of a broader Jerusalem beltway intended to let traffic travel west toward Tel Aviv or east toward the Dead Sea without passing through the city center.[3] At that time, the proposed eastern section—from East Talpiot to A-Tur and involving tunnels and a bridge over the Kidron Valley—remained unresolved with the Jerusalem Development Authority.[3]

03Construction and Physical Characteristics

Construction of the Jerusalem segment was underway by 2006, and the road opened to traffic at the end of 2007.[2][1] The route is approximately two kilometers long and features two tunnels, each 400 meters in length.[1] Five bridges run along the road, three of which connect it directly with national Highway 1.[1]

The road was built to environmental standards, including a specially formulated asphalt surface designed to absorb vehicle noise.[1] The measure formed part of the environmental standards applied along the Emek ha-Arazim route. The Motza Interchange is identified as being on Highway 9.[4]

04Naming and Commemoration

The Ministry of Education guide associates the Highway 9 area at Jerusalem's western approach with the commemoration of former prime minister Yitzhak Shamir, but identifies Derech Yitzhak Shamir itself as a section of Highway 1 between the Sha'ar Moriah and Yigal Yadin interchanges.[1] The guide also describes the numbered road segment ascending toward Jerusalem as commemorating Shamir and reproduces remarks from a dedication ceremony honoring his connection to the city.[1]

06Northern Route 9: Hadera and the Hefer Valley

A geographically separate road in northern Israel carries the same Route 9 designation. This road connects Route 4 with Route 6 in the Hadera area and serves the Hefer Valley settlements, functioning as an express route in northern Israel.[6] Its western section opened to traffic on July 24, 2014.[6] The eastern section followed on May 30, 2016, enabling a direct connection between Hadera and the Hefer Valley settlements and Route 6.[7]

Sources

  1. 1Israel Ministry of Education, אגף של"ח וידיעת הארץ (accessed September 17, 2026)
  2. 2Encyclopedia.com (accessed September 17, 2026)
  3. 3The Jerusalem Post, Jerusalem deconstructed (accessed September 17, 2026)
  4. 4Israel Hayom, New traffic lanes lead to Jerusalem (accessed September 17, 2026)
  5. 5The Times of Israel, New Jerusalem tunnels, highway system aimed to ease traffic jams by 2024 (accessed September 17, 2026)
  6. 6Israel Central Bureau of Statistics, General Events (accessed September 17, 2026)
  7. 7Israel Central Bureau of Statistics, Traffic Counts on Non-Urban Roads 2015–2020 (accessed September 17, 2026)

IsraelPedia Question & Answers

  • What is Highway 9 in Israel?

    Highway 9 is a road designation shared by two geographically distinct roads in Israel: a Jerusalem entrance road running through Emek ha-Arazim, and a northern expressway connecting the Hadera area with the Hefer Valley. The Jerusalem segment is approximately two kilometers long and was built to reduce traffic congestion at the western entrance to the city, opening at the end of 2007. The northern route, which links Route 4 with Route 6 in the Hadera region, opened in stages between 2014 and 2016.

  • What is the purpose of the Jerusalem segment of Highway 9?

    The Jerusalem segment of Highway 9 was established by the Jerusalem Municipality through the Moriah Jerusalem Development Corporation to reduce traffic congestion at the entrance to Jerusalem and provide a fast entry and exit route for the city's northern neighborhoods. The road links the Motza junction with the Ramot junction and connects with Begin Boulevard at the foot of Har Hotzvim. Plans reported in 2008 also treated it as the northern section of a broader Jerusalem beltway intended to let traffic travel west toward Tel Aviv or east toward the Dead Sea without passing through the city center.

  • What are the physical features of the Jerusalem segment of Highway 9?

    The Jerusalem segment of Highway 9 is approximately two kilometers long and features two tunnels, each 400 meters in length, along with five bridges, three of which connect it directly with national Highway 1. The road was built to environmental standards, including a specially formulated asphalt surface designed to absorb vehicle noise.

  • What is the connection between Highway 9 and Yitzhak Shamir?

    A Ministry of Education guide associates the Highway 9 area at Jerusalem's western approach with the commemoration of former prime minister Yitzhak Shamir. The guide describes the numbered road segment ascending toward Jerusalem as commemorating Shamir and reproduces remarks from a dedication ceremony honoring his connection to the city.

  • What infrastructure projects are linked to Highway 9 at Jerusalem's entrance?

    In February 2021, a NIS 330 million project was underway to expand Highway 1 at Jerusalem's entrance, including widening the inbound road from the Motza Interchange — identified as Highway 9 — toward Givat Shaul. The 2.4-kilometer project also included a bidirectional public-transport route, geometric road changes, traffic-lane regulation, and landscaping. A separate French Hill tunnels project, which broke ground in 2020, was intended in part to provide a future rapid connection to Highway 9 and onward to Highway 1 toward Tel Aviv.

  • When did the northern Route 9 open, and what does it connect?

    The northern Route 9 connects Route 4 with Route 6 in the Hadera area and serves the Hefer Valley settlements as an express route in northern Israel. Its western section opened on July 24, 2014, and its eastern section followed on May 30, 2016, enabling a direct connection between Hadera and the Hefer Valley settlements and Route 6.