01In brief
Herzliya railway station is a passenger railway station serving Herzliya. The electric train service from Jerusalem reached the station on September 21, 2020, enabling passengers to travel from Jerusalem’s Navon Station to Herzliya without changing trains. An expansion project announced in 2023 was intended to double the station’s size and improve access from nearby employment centers and other forms of transport.
02Overview
Herzliya provides direct rail travel from Jerusalem.[3] Expansion plans emphasized access to nearby employment centers and connections with other forms of transport.[1] In 2023, the station handled approximately 1,500 passengers during the peak hour and 15,000 daily trips, with 336 trains passing through it.[1] Expansion plans projected approximately 3,000 peak-hour passengers, 30,000 daily trips, and 400 trains by 2030.[1]
The planned enlargement focused on a new passenger hall west of the existing station and Ayalon Highway, near commercial and employment centers.[1] Two bridges were intended to connect the passenger halls and platforms, providing direct access from employment areas west of the station.[1][4]
03History
In 2003, the station had a single platform described as being in poor condition, and a replacement project was proposed at a reported cost of NIS 30 million.[5] Plans called for a modern enclosed station with toilets and escalators, together with a bridge to the Herzliya Pituah industrial zone.[5] The bridge was intended to enable thousands of workers to reach the industrial zone by train from both north and south; the planned opening date was February 2004.[5] Architect Ehud Shani designed the Herzliya railway station.[6]
Severe flooding disrupted the station on January 6, 2013, when local firefighters rescued seven trapped people and a dog.[7] Flooding in Netanya also closed the Tel Aviv–Haifa line, halting services in both directions before normal operations resumed after several hours.[7] Floodwater blocked Herzliya station’s underground passage to the platforms, and passenger trains did not stop there.[8] Some stranded passengers crossed the tracks and climbed fences to leave, while firefighters rescued two pedestrians and five drivers caught in water near the station entrance.[8] Replacement shuttle buses connected Herzliya with Beit Yehoshua and Tel Aviv Savidor.[8]
In September 2016, Herzliya was the first operating station north of Tel Aviv during the closure of three central Tel Aviv stations for railway works.[9] Construction included doubling and widening tracks between Tel Aviv University and Herzliya as part of infrastructure preparations for the Jerusalem–Tel Aviv express line.[9]
Herzliya station closed for ten days in August 2017 during further work connecting infrastructure to the Jerusalem line.[10] On the Tel Aviv–Beit Yehoshua section, workers installed railway and electrification infrastructure, dismantled and reassembled tracks on a changed alignment, and prepared for the ETCS Level 2 control system.[10] The station itself was refurbished: ticket validators were replaced, toilets renovated, and platform elements renewed.[10] Crews also inspected tracks already laid for the Jerusalem line, over which a freight train had traveled for the first time.[10]
By January 2018, Herzliya was identified as the planned northern endpoint of the Jerusalem express line, although the initial operating stage was expected to connect Jerusalem’s Binyanei HaUma station only with Tel Aviv HaHagana.[11] When Jerusalem’s Navon Station opened in September 2018, its service reached Ben-Gurion Airport, requiring passengers continuing to Tel Aviv to change trains.[3] The electric service subsequently reached Tel Aviv Savidor Central in June 2020 and Herzliya on September 21 of that year.[2] By 2021, passengers could travel from Navon Station to Herzliya without a transfer.[3]
04Expansion and Service Plans
A tender issued in 2023 proposed a new passenger hall intended to double the station’s size.[1] Besides the western hall and two connecting bridges, the project included extended platforms, parking for cars, two-wheelers and bicycles, and a public-transport terminal.[1] The 2023 forecast said the renovated station would open in 2026.[1]
The expansion remained described as a project in progress in 2025, with an accessible passenger hall and direct pedestrian links from employment centers west of Ayalon Highway.[4] Bridge construction plans called for lifting 17 steel beams, each 45 meters long and weighing 80 tonnes, as well as 26 concrete beams weighing between 50 and 75 tonnes.[4] Completion was expected in 2026, rather than reported as already achieved.[4]
A timetable change scheduled for November 14, 2026, was to extend the Jerusalem Yitzhak Navon–Tel Aviv–Herzliya service to Hadera West, Netanya, and Beit Yehoshua, giving passengers at those stations direct access to Ben-Gurion Airport.[12] Other announced changes included increased daily seating capacity at Herzliya and alterations to the Beit Shemesh–Netanya and Rehovot–Netanya routes, whose trains were to begin and end at Herzliya rather than Netanya or Tel Aviv Savidor Central.[13] These changes were still scheduled for the future as of November 9, 2026.[12][13]
05Economy and Culture
Access to the Herzliya Pituah industrial zone was a central element of the station replacement proposed in 2003, which included a bridge intended for workers arriving by rail.[5] The later expansion likewise emphasized connections to commercial and employment centers west of the station, alongside interchange with other transport.[1][4]
06Notable Sites
Sources
- 1Maariv, Good news for passengers: Herzliya railway station will undergo a significant upgrade, accessed on November 9, 2026.
- 2Ynet, The consumer battles with carriage owners and the days when people traveled from Jerusalem to Cairo and Beirut by train, accessed on November 9, 2026.
- 3Jerusalem Institute for Policy Research, A Return Trip to the Train from Jerusalem, accessed on November 9, 2026.
- 4Maariv, A blow to passengers and drivers: Ayalon Highway lanes will be closed; changes to train services, accessed on November 9, 2026.
- 5Ynet, A train accelerating, accessed on November 9, 2026.
- 6Ynet, Terminal station: Is Israel ready to give up its central stations?, accessed on November 9, 2026.
- 7Globes, Flooding halts Tel Aviv-Haifa trains, accessed on November 9, 2026.
- 8Ynetnews, The rain and the damage: Railway stations flooded, drivers rescued, accessed on November 9, 2026.
- 9The Times of Israel, accessed on November 9, 2026.
- 10Globes, Train service between Tel Aviv and Beit Yehoshua resumed; Herzliya station opened, accessed on November 9, 2026.
- 11Ynetnews, Jerusalem express railway expected to begin operations in March, accessed on November 9, 2026.
- 12Ynetnews, New railway schedule: direct line from Hadera to Ben Gurion Airport, station cancellations on Be'er Sheva-Karmiel route, accessed on November 9, 2026.
- 13Calcalist, Around the clock: Israel Railways to operate direct routes to Ben-Gurion Airport and Jerusalem 24 hours a day, accessed on November 9, 2026.
- 14Jewish Virtual Library, The Eli Cohen Museum, accessed on November 9, 2026.
IsraelPedia Question & Answers
What is Herzliya railway station?
Herzliya railway station is a passenger railway station serving Herzliya. Since September 21, 2020, electric trains from Jerusalem’s Navon Station have reached Herzliya without requiring passengers to change trains.
What expansion was planned for Herzliya railway station?
A project proposed in 2023 was intended to double Herzliya railway station’s size with a new passenger hall west of the existing station and Ayalon Highway. Plans included two bridges connecting the halls and platforms, extended platforms, parking, and a public-transport terminal. Completion was expected in 2026, but the project was still described as in progress in 2025.
How was Herzliya railway station affected by the flooding in 2013?
Severe flooding disrupted Herzliya railway station on January 6, 2013. Floodwater blocked the underground passage to the platforms, and passenger trains did not stop at the station. Firefighters rescued seven people and a dog, including two pedestrians and five drivers caught in water near the station entrance; shuttle buses connected Herzliya with Beit Yehoshua and Tel Aviv Savidor.
How did Herzliya railway station help passengers reach the Jerusalem line?
Herzliya railway station served as the planned northern endpoint of the Jerusalem express line. Electric service reached Herzliya from Jerusalem’s Navon Station on September 21, 2020, and by 2021 passengers could make the journey without a transfer.
How was Herzliya railway station connected to the Herzliya Pituah industrial zone?
A station replacement project proposed in 2003 included a bridge to the Herzliya Pituah industrial zone, intended to help thousands of workers reach the area by train from both north and south. Later expansion plans also emphasized links to commercial and employment centers west of the station.
What future train service changes were planned for Herzliya railway station?
A timetable change scheduled for November 14, 2026, was to extend the Jerusalem Yitzhak Navon–Tel Aviv–Herzliya service to Hadera West, Netanya, and Beit Yehoshua, giving passengers at those stations direct access to Ben-Gurion Airport. Other scheduled changes included increased daily seating capacity at Herzliya and changes to the Beit Shemesh–Netanya and Rehovot–Netanya routes, whose trains were to begin and end at Herzliya.