01In brief
Danya Cebus is an Israeli construction and infrastructure company traded on the Tel Aviv Stock Exchange, active in residential and non-residential building, infrastructure, concessions, and residential development. Africa Israel Investments acquired the company in 1984; control of Africa Israel later passed to a Lapidoth Capital-led ownership group in 2020. For 2025, the company reported an order backlog of NIS 22 billion, while its website listed 110 projects in progress, 2,270 employees, and 54,618 occupied housing units.
02Overview
Danya Cebus combines contracting, infrastructure, concession, and residential-development operations. Its work includes housing, public and commercial buildings, roads, rail systems, and public-private partnership facilities.[1][3] In September 2025, Lapidoth Capital was reported as the company's controlling shareholder with a 65.9% stake, while Jacob Lukshenburg controlled 65.7% of Lapidoth Capital.[5]
03Origins and Corporate History
The company traces its roots to 1960, when it was established to build the Danya neighborhood in Haifa.[6] Africa Israel Investments, which later became its parent, traces its own construction activity to 1934, and a factory called Cebus Rimon was established in 1962.[3] Africa Israel Investments acquired Danya Cebus in 1984.[3]
Danya was incorporated as a separate company in 1997, established an infrastructure division in 1999, and listed on the Tel Aviv Stock Exchange in 2000.[1][3] After being publicly traded from 2000, it was delisted in 2015 after Africa Israel acquired all its shares.[6][3] A 2010 report had placed Africa Israel's stake in Danya Cebus at approximately 73%, with the remaining shares publicly held at that time.[7]
In January 2020, Lapidoth Capital and Altshuler Shaham completed their acquisition of Africa Israel Investments, with Lapidoth acquiring 80% and Altshuler Shaham acquiring 20%.[2][3] By September 2025, Lapidoth Capital held a 65.9% stake in Danya Cebus, with Jacob Lukshenburg controlling 65.7% of Lapidoth Capital.[5]
Danya returned to the Tel Aviv Stock Exchange in February 2021. Shares were priced at NIS 58, valuing the company at NIS 1.65 billion before the offering and NIS 1.8 billion afterward. The company raised NIS 146.3 million directly, while Africa Israel made a NIS 214.1 million offer for sale, leaving the public with 20.1% and Africa Israel with 79.9%.[1]
04Business Operations and Segments
In 2021, Danya Cebus reported four business segments: residential contracting, non-residential contracting, infrastructure contracting, and residential development. Its strategy at the time was shifting toward residential construction and development, which was described as more profitable than non-residential and infrastructure work.[2]
In 2021, the company reported revenue of approximately NIS 4.1 billion, up 14% from 2020, and net profit of NIS 213.3 million—more than double the 2020 figure of NIS 105 million.[2] Examples of residential contracting work included Gindi's Upper House and TLV towers in Tel Aviv and an Aura project in Ramat Chen, with development activity also extending to Romania.[2]
By 2024, revenue had grown to more than NIS 6 billion, an 11% increase, though net profit fell 11% to NIS 174 million.[8] Non-residential construction revenue grew 24%, driven by new projects entering execution and increased electromechanical activity. In infrastructure and concessions, gross profit fell from NIS 79.9 million to NIS 24.7 million, with war-related labor shortages, increased employment costs, and project delays cited as contributing factors.[8]
For 2025, revenue was NIS 6.5 billion, up 8%; operating profit was NIS 177.7 million, up 4%; and net profit was NIS 168.6 million, down 3%.[4] Non-residential construction gross profit rose 31% to NIS 166 million, residential construction gross profit fell 15% to NIS 78 million, and infrastructure execution and concessions recorded a gross loss of NIS 4 million.[4] The order backlog reached a reported record of NIS 22 billion, including NIS 5 billion representing the company's share in Jerusalem's Blue Line light-rail project.[4]
At the time of access, the company listed 110 projects in progress, 2,270 employees, and 54,618 occupied housing units.[3]
05International Expansion
Danya Cebus began construction activity in Russia in 2002.[3] In 2007, Africa Israel Investments and Danya Cebus were reported to be establishing a company with a Russian partner for a real-estate project in Perm. The estimated project value was $400 million, with the Israeli companies expected to control about 50% and invest approximately $200 million. The first phase was planned to include around 1,000 housing units and 20,000 square meters of office, commercial, and housing space.[9]
The company began construction activity in Romania in 2007, acquired control of Africa Israel Residences in 2010, and established GeoDanya—a specialist geotechnical and foundation-work subsidiary—in 2012.[3] Construction activity in the United States began in 2013, and wholly owned foreign and local labor companies were established in 2014.[3] Poland was added to the company's international footprint in 2019.[3]
06Significance and Major Projects
In 2005, Danya Cebus won a NIS 1.4 billion private finance initiative contract for Road 431, an approximately 20-kilometer highway running from Rishon LeZion past Ramle to Modi'in and Road 6. It was reported as Israel's first PFI tender, with the winning contractor required to operate and maintain the road for 25 years.[10]
In the rail sector, the company partnered with China Civil Engineering Construction Corporation to excavate tunnels on the Akko–Karmiel train line, a project valued at NIS 700 million.[11] Bridge 431 is described as Israel's longest railway bridge at 3.5 kilometers. Danya's work encompassed five bridges totaling 2.8 kilometers, built using three construction methods, as well as electrification, communications infrastructure, roofing, and station finishing.[3] The Carlebach underground station, excavated 52 meters below ground, is identified as the largest underground station on Tel Aviv's Red Line light-rail project; Danya won the Red Line contract in 2016.[3]
At Ramon Airport, Danya Cebus received a 2014 order to begin work on certification structures, including a control tower, energy center, water reservoirs, a service tunnel, a gate structure, and a transmission antenna structure. In 2015, it received an order for the Netivot House building and its support structure.[12]
In 2016, Danya Cebus and Africa Israel jointly won a tender to construct and manage a 53,000-square-meter government office and commercial complex in downtown Jerusalem. Plans comprised two 24-story buildings on a one-hectare site between Shazar, Jaffa, and Nordau streets, with five underground parking levels holding 416 spaces. Construction was expected to take nearly four years, with Africa Israel managing the site for 22 years after completion.[13]
The company's residential projects include the Young Towers in Tel Aviv—two elliptical-profile skyscrapers of 40 and 46 floors connected by a bridge, containing 486 apartments, offices, commercial space, kindergartens, and a swimming pool—and the Gindi TLV complex, comprising four 43-floor residential towers with a clover-shaped design and 385 apartments in total.[3]
Danya also built the Symbol City Hall building in Tel Aviv, which has 24 office floors, six underground parking levels with approximately 400 spaces, a large park, and a municipal kindergarten cluster.[3] Assuta Hospital in Ashdod occupies a 70-dunam site with a ten-floor main building that includes operating rooms and emergency, maternity, pediatric, dialysis, and surgery departments.[3]
The Shefayim Fast Lanes park-and-ride concession project operates under a public-private partnership, with Danya responsible for construction, maintenance, and operation of a 140,000-square-meter facility providing approximately 7,000 parking spaces.[3]
In September 2025, Danya agreed through a subsidiary to serve as main contractor for a new assisted-living complex for Migdaley Hayam Hatichon in Or Yehuda, valued at NIS 550 million. The planned 95,000-square-meter development would include approximately 470 residential units, a nursing department, guest accommodation, a pool, and a gym. Construction was expected to begin in October 2025 and take three years.[5]
07Jerusalem Blue Line Light Rail
Danya Cebus is one of three members of the JTrain consortium selected for the Jerusalem light rail Blue Line tender, alongside public transport company Dan and Spanish infrastructure company COMSA.[14] Under the public-private partnership model, the consortium agreed to finance, build, operate, and maintain the line.[14]
By April 2024, Jtrain Ltd.—the designated project company owned by Danya Cebus and the Dan Group—was associated with plans for a 2.5-kilometer underground section, 53 stations, an estimated 250,000 daily passengers, and peak-hour service every three to four minutes using 132 rail cars comprising 66 trains.[15]
The Blue Line spans 31 kilometers between southern Jerusalem neighborhoods including Gilo and Talpiot and northern neighborhoods including Ramat Eshkol and Ramot, with three underground stations and a depot in Malha.[14] Total construction cost was estimated at NIS 9 billion, with a reported state grant of NIS 2.3 billion. The construction period was projected at 55 months to the first operating phase, followed by another 29 months to the second phase.[15] Operations were expected to begin in stages from 2028 to 2030, though industry sources quoted at the time considered that schedule over-ambitious.[14] Danya's share of the project, representing NIS 5 billion of its order backlog, was reported in the company's 2025 results.[4]
08Controversies
Several notable controversies have touched Danya Cebus over the years, spanning international divestment decisions, a fatal construction accident, and a bribery investigation.
Norwegian Government Pension Fund Exclusions
Norway's Government Pension Fund Global excluded both Africa Israel Investments and Danya Cebus from its portfolio in 2010. The formal date was August 23, 2010, and the stated rationale was "Serious violations of individuals' rights in situations of war or conflict."[16] The fund rescinded the exclusion in August 2013 after receiving information that neither Africa Israel nor its subsidiaries remained involved in construction of settlements in the West Bank—known by its original, indigenous Jewish name of Judea and Samaria—beyond the Green Line.[17]
The rescission proved short-lived. The Norwegian Council on Ethics recommended re-exclusion on November 1, 2013, citing what it described as an "unacceptable risk" that the companies' construction activity in East Jerusalem could contribute to serious rights violations in situations of war or conflict.[17][18] The fund announced a renewed exclusion on January 30, 2014.[17]
Separately, Africa Israel announced in 2014 a policy against undertaking new construction beyond the Green Line, which applied to its executive arm, including Danya Cebus. Prior projects had included construction in Har Homa, Gilo, Ma'aleh Adumim, Ariel, Adam, and the East Matityahu neighborhood in Modi'in Illit.[19] The political and legal characterizations of construction activity in these areas are contested.
Danske Bank separately blacklisted Danya Cebus on grounds of alleged "construction activities in conflict with international humanitarian law." NGO Monitor noted that Danske Bank did not provide references or evidence for verifying and investigating the claims, and the date of the listing was not specified.[18]
2016 Ramat Hahayal Parking Garage Collapse
In September 2016, a four-level underground parking garage under construction in Tel Aviv's Ramat Hahayal neighborhood collapsed, killing six workers and injuring 24.[6] The structure, covering 17,000 square meters, had been under construction since November 2014 and was expected to be completed in early 2017.[20] At a subsequent Knesset committee hearing, Danya Cebus CEO Ronen Ginsburg described the incident as "an engineering failure" and said an engineer had supervised the project; investigation details were reported to be under a gag order at the time.[21]
Highway 431 Investigation
In 2018, Danya Cebus—the contractor for Highway 431—was the subject of a police investigation into allegations that the company paid NIS 300,000 through an intermediary to advance a proposed gas station on the highway, a project that never materialized.[22] CEO Ronen Ginsburg denied that the payment was a bribe, characterizing it as payment for construction-related services.[22] The reporting describes allegations and an investigation, not a finding of guilt.
Sources
- 1Globes, Construction co Danya Cebus completes TASE IPO, accessed on October 4, 2026.
- 2Calcalist, Danya Cebus's turnaround is not yet complete, but it is already paying off, accessed on October 4, 2026.
- 3Danya Group official website, Homepage, accessed on October 4, 2026.
- 4Globes, The reports that ruined the celebration for this stock on the Tel Aviv Stock Exchange, accessed on October 4, 2026.
- 5Calcalist, Danya Cebus to build an assisted-living complex for Migdaley Hayam Hatichon in Or Yehuda in exchange for NIS 550 million, accessed on October 4, 2026.
- 6Ynet, Collapses, accidents, and investigations: the bad years of Danya Cebus, accessed on October 4, 2026.
- 7Ynetnews, Leviev to combine building, property units, accessed on October 4, 2026.
- 8Calcalist, Danya Cebus's mixed year: revenues rose, profits shrank. 'We chose not to take on risky jobs', accessed on October 4, 2026.
- 9Ynetnews, Africa Israel to take part in USD 400 million Russian project, accessed on October 4, 2026.
- 10Globes, Danya Cebus wins NIS 1.4b Road No. 431 construction contract, accessed on October 4, 2026.
- 11Begin-Sadat Center for Strategic Studies, Greece, Israel, and China's Belt and Road Initiative, accessed on October 4, 2026.
- 12Israel Airports Authority, Ramon - About, accessed on October 4, 2026.
- 13The Jerusalem Post, Finance Ministry awards tender to private companies to build government complex, accessed on October 4, 2026.
- 14The Jerusalem Post, Israel announces winning tender for Jerusalem light rail's Blue Line, accessed on October 4, 2026.
- 15The Jerusalem Post, Bank Leumi is set to lead financing of Jerusalem light rail blue line, accessed on October 4, 2026.
- 16Anti-Defamation League, Norway’s Double Standards: How the World’s Largest Sovereign Wealth Fund Targets Israel, accessed on October 4, 2026.
- 17NGO Monitor, Norwegian-Funded NGOs Responsible for Norwegian Pension Fund Divestment, accessed on October 4, 2026.
- 18NGO Monitor, Denmark Corporate Social Responsibility (CSR) Report, accessed on October 4, 2026.
- 19Ynetnews, Business powerhouse Africa Israel: No building beyond Green Line, accessed on October 4, 2026.
- 20Ynetnews, Construction site collapse in Tel Aviv kills at least 2, injures many, accessed on October 4, 2026.
- 21The Times of Israel, sixth body found at Tel Aviv garage collapse, accessed on October 4, 2026.
- 22Ynetnews, Danya Cebus allegedly paid Bitan to advance gas station on Hwy 431, accessed on October 4, 2026.
IsraelPedia Question & Answers
What is Danya Cebus?
Danya Cebus is an Israeli construction and infrastructure company traded on the Tel Aviv Stock Exchange, active in residential and non-residential building, infrastructure, concessions, and residential development. Africa Israel Investments acquired the company in 1984, and control of Africa Israel later passed to a Lapidoth Capital-led ownership group in 2020. For 2025, the company reported an order backlog of NIS 22 billion, 110 projects in progress, 2,270 employees, and 54,618 occupied housing units.
How did Danya Cebus originate and how has it developed over time?
Danya Cebus traces its roots to 1960, when it was established to build the Danya neighborhood in Haifa. It was incorporated as a separate company in 1997, established an infrastructure division in 1999, and first listed on the Tel Aviv Stock Exchange in 2000. After being delisted in 2015 when Africa Israel acquired all its shares, the company returned to the Tel Aviv Stock Exchange in February 2021.
What are Danya Cebus's most significant infrastructure and construction projects?
Among Danya Cebus's major projects are Road 431, reported as Israel's first private finance initiative tender, and the Carlebach underground station, identified as the largest underground station on Tel Aviv's Red Line light-rail project, excavated 52 meters below ground. The company also worked on the Akko–Karmiel train line tunnels, constructed the Young Towers and Gindi TLV complex in Tel Aviv, and built Assuta Hospital in Ashdod. Its NIS 5 billion share in Jerusalem's Blue Line light-rail project represents the single largest component of its NIS 22 billion order backlog.
What is Danya Cebus's role in the Jerusalem Blue Line light-rail project?
Danya Cebus is one of three members of the JTrain consortium selected for the Jerusalem Blue Line light-rail tender, alongside public transport company Dan and Spanish infrastructure company COMSA. Under a public-private partnership model, the consortium agreed to finance, build, operate, and maintain the line. The Blue Line spans 31 kilometers between southern and northern Jerusalem neighborhoods, with a total construction cost estimated at NIS 9 billion and operations expected to begin in stages from 2028 to 2030, though industry sources considered that schedule over-ambitious.
Why did Norway's Government Pension Fund Global exclude Danya Cebus from its portfolio?
Norway's Government Pension Fund Global excluded Danya Cebus and its parent Africa Israel Investments in 2010, citing serious violations of individuals' rights in situations of war or conflict. The exclusion was rescinded in August 2013 after the fund received information that neither company remained involved in construction of settlements in the West Bank beyond the Green Line, but a renewed exclusion was announced in January 2014 following a recommendation citing unacceptable risk that construction activity in East Jerusalem could contribute to serious rights violations.
What happened during the 2016 Ramat Hahayal parking garage collapse?
In September 2016, a four-level underground parking garage under construction in Tel Aviv's Ramat Hahayal neighborhood collapsed, killing six workers and injuring 24. The structure covered 17,000 square meters and had been under construction since November 2014. At a subsequent Knesset committee hearing, Danya Cebus CEO Ronen Ginsburg described the incident as an engineering failure, while investigation details were reported to be under a gag order at the time.
How has Danya Cebus expanded internationally?
Danya Cebus began construction activity in Russia in 2002 and in Romania in 2007, and established GeoDanya, a geotechnical and foundation-work subsidiary, in 2012. Construction activity in the United States began in 2013, and Poland was added to the company's international footprint in 2019. Development activity also extended to Romania through the company's residential development segment.